Screen Reader Access Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Civil Engineering
            POLICY_MATTERS_OTHERS
               CE_III_Bridge_Policy


 
CE_III_Bridge_Policy

Letter No.

Date

Subject

2020/17/CE-III/BR/Girder Inspection 31.07.2025 Procedure of Proof Checking of Design of Bridges
2014/CE-III/BR/NDMA 17.07.2025 Adherence to guidelines for fabrication, quality control, erection, inspection & maintenance of steel plate/composite steel girder foot over bridges
2017/16/CE-III/BR/Girder Inspection 02.06.2025 Monitoring Competence of Personnel employed by Third Party for fabrication inspection & erection of Steel Girders
2023/48/CE-III/BR/3000 MT 05.05.2025 Assessment of Residual Fatigue Life of Steel Girder Bridges as on 21.03.2025
2021/4/CE-III/BR/I/Monsoon 24.03.2025 Monsoon Precautions(2025-26)
No.2025/W-I/Genl./Bridges 10.01.2025 Improving the planning and construction of major or Important bridges and opening thereof.
No. 2021/21/CE-III/BR/TAG/Br. 47 26.12.2024 Design Basis Report (DBR) and Technical Advisory Group (TAG) for new important bridges.
No. 2021/55/CE-III/BR/Tunnel 27.11.2024 Development of “Tunnel Inspection” module in TuMS application.

No.2022/19/CEIII/BR/Girder Inspection

26.10.2024

Planning of non-standard spans of Open web Girders of New line, Doubling and Multi tracking works of Railways

No.2023/48/CE-III/BR/3000 MT

04.10.2024

Residual Fatigue assessment of steel bridges for running of Heavier Axle loads.

 

No.2023/19/CE-III/BR/RDSO/1

08.08.2024

Strengthening of Design cells & Bridge Line units

 

No.2021/25/CE-III/BR/1/BMS/Drone

06.08.2024

Launch of “Tunnel Master” module of
Tunnel Management System(TUMS)

 

No. 2024/35/CE-III/BR/Safety

05.08.2024

Review of Outcome of Third Party Audit of Railway Bridge/ROBs/FOBs

 

No.2023/48/CE-III/BR/3000 MT

13.06.2024

Residual Fatigue assessment of steel bridges for running of Heavier Axle loads.

 

No. 2023/48/CE-III/BR/3000 MT

04.06.2024

Residual Fatigue assessment of steel bridges for running of Heavier Axle loads.

 

No.2021/4/CE-III/BR/I/Monsoon

29.05.2024

Monsoon Precautions(2024-25)

 

No. 2017/50/CE-lll/BR/FOB

26.04.2024

Comprehensive Inspection & Maintenance of FOBs.

 

No. 2016/52/CE-lll/BR/ Safety

22.04.2024

Protection of bridge piers and bridges on navigational/freight ferry movement

routes.

No. 2017/50/CE-lll/BR/FOB

09.04.2024

Safety drive for "Foot over bridges".

 

No.2024/10/CE-III/BR/Professor-of-Practice

05.03.2024

Utilisation of Service of Professor of Practice at IITs/Engg Institution of repute.

 

No.2021/25/CE-III/BR/1/BMS/Drone

08.02.2024

Introduction of Monsoon Booklet Module in Bridge Management system (BMS) application as per para 709 of IRBM.

 

No. 2023/3/CE-III/BR/BSC/87th BSC

31.01.2024

Revision of Loading standard.

 

No.2022/CE-III/BR/RDSO/ 1

31.01.2024

Method Statements and adequate supervision during launching PSC Girders.

 

2017/16/CE-III/BR/Girder Inspection

27.12.2023

Third Party Inspection (TPI) of fabrication & erection of steel girders.

No. 2017/50/CE-lll/BR/FOB

27.12.2023

Survey of redundant overhead structures.

No.2021/25/CE-III/BR-III/1 /BMS/Drone

24.11.2023

Provision of Flood Report Module in Bridge Management System (BMS) as per Para 715 of IRBM.

No. 2023/W-I/Genl/Misc

22.11.2023

Construction of Escape Tunnel during Tunneling Works over Indian Railways.

 

No.2017/09/CE-III/BR/UWI

21.11.2023

Under Water Inspection of Bridges.

No. 2015/CE-III/BR/Water Level Gauge

15.11.2023

Installation of Water Level Monitoring Instrument (WLMI) at identified bridges.

No 2021/25/CE-III/BR-III/1 /BMS/Drone

02.11.2023

Inspection of Bridges through Bridge Management System (BMS).

No. 2017/10/CE-III/BR/PSC Slabs

19.10.2023

Proposals of Works of replacement/regirdering of Steel Girders Bridge.

No. 2014/CE-III/BR/Bridge Policy

19.10.2023

Bridge –Inspection & Maintenance under Own Your Bridge(OYB) Inspection Drive.

No.2015/CE-III/BR/Yardsticks for Bridges

08.08.2023

Merger of Cadres.

No. 2014/CE-III/BR/Bridge Policy

25.07.2023

Bridges- Inspection and Maintenance

No. 2014/CE-III/BR/Bridge Policy

24.07.2023

Bridges- Inspection and Maintenance

No.2021/14/CE-lll/BR/1/Monsoon

12.07.2023

Requirement for prevention and settlement of Breaches in flood prone areas.

No.2022/7/CE-III/BR/CBEs Seminar

30.05.2023

RSI analysis with design of bridge before execution of the work.

2022/7/CE-III/BR/Fabrication

29.05.2023

Rail Crossings across the Existing IR Track by Metro Rail Corporations.

2017/16/CE-llI/BR/Girder Inspection

29.05.2023

Policy for Rail Crossings across the Existing IR Track by NHSRCL.

No.2021/14/CE-III/BR/1/Monsoon

24.05.2023

Monsoon Precautions(2023-24)

No.2021/25/CE-III/BR-III/1/BMS/Drone

18.05.2023

Implementation of BMS on Indian Railways.

No. 2017/50/CE-lll/BR/FOB

11.05.2023

FOB inspection module in BMS.

 

No.2021/14/CE-III/BR/1/Monsoon

25.04.2023

Monsoon Precautions(2023-24)

 

No. 2023/19/CE-III/BR/RDSO/1

25.04.2023

Design & Drawing of FOB 12m wide for span 25 to 30 m and Ramp.

 

2014/CE-III/BR/Bridge Policy

20.04.2023 Constitution of Technical Advisory Group (TAG) / Technical Advisory Committee (TAC) for new important bridges / Rebuilding - Rehabilitation - retro fitment of Major & Important Bridges.
No. 2022/CE-III/BR/Fabrication (E-File-3401728) 23.02.2023 Outsourcing of fabrication of structural steel work for bridge girders for various projects.
No. 2021/25/CE-III/BR/BMS/Drone 15.12.2022 Integration of 4D BrIM in BMS.
No. 2017/50/CE-III/BR/FOB 29.11.2022 Structural safety drive for "Foot Over Bridges (FOBs)".
No. 2021/3/CE-III/BR/1/CBEs Seminar 22.11.2022 CBEs Seminar held on 02nd & 03rd December, 202l at IRICEN/Pune.
No. 2017/16/CE-III/BR/Girder Inspection 17.11.2022 Inspection and Certification of structural steel fabrication and erection works for Infrastructure projects in India and Abroad.

No. 2018/08/CE-III/BR/CRB & CEO-MoMs

10.11.2022 Minutes of Meeting held on 21.10.2022 through Video Conference regarding "Procedure of Engineering material through stores and digitization of Engineering procurement".
No. 2016/39/CE-III/BR/BLT 26.10.2022 Technical Eligibility criteria and special conditions of contract for design and construction of Ballastless track (BLT) on viaduct/tunnels on IR.
No. 2022/3/CE-III/BR/CBE Conference 21.10.2022 Development of RDSO’s standard drawings of 6m wide FOB for span 25m to 30m with composite I-Girder & Tubular sections.
No. 2021/2/CE-III/BR/1/Bridge Policy 20.10.2022 Quality control on bridge works on projects
No. 2015/CE-III/BR/RAW 11.10.2022 Use of RAW/RAT Module in IR-BMS Application.
No. 2017/07/CE-III/BR/Safety 27.09.2022 Use of Permanent Shuttering in Bridges.
No. 201716/CE-III/BR/Girder Inspection 16.09.2022 Fabrication of Steel Bridge Girders.
No. 2015/CE-III/BR/Substructure Code 14.09.2022 Need for Standard Drawings of PSC slabs or Arches for low level bridges.
No. 2022/CE-III/BR/Bridge Workshop Policy 07.09.2022 Fabrication of Girders through Bridge Workshops..
No. 2014/CE-III/BR/Bridge Workshop Policy 24.08.2022 Fabrication of Girders through Bridge Workshops.
No. 2017/48/CE-III/BR/DFC Feeder 19.07.2022 Mission 3000 MT by the year 2027 - Railway Bridge Works for Western Dedicated Freight Corridor (WDFC) & Eastern Dedicated Freight Corridor (EDFC) there upon.
No. 2021/14/CE-III/BR/1/Monsoon

06.07.2022

Arrangement of Wagons for loading of Boulders, Ashes etc. during Monsoon.

2019/27/CE-III/BR/86th BSC 22.06.2022 Standard inspection arrangement for bridges.
2017/16/CE-III/BR/Girder Inspection 21.06.2022 Fabrication Inspection Unit (FIU) for inspection of New Steel Bridge Girder.
2021/01/CE-III/BR/WP/2021-22 08.06.2022 Bridge works proposals under Umbrella Works of PH-32.
2017/48/CE-III/BR/DFC Feeder 03.06.2022 Implementation of the Report of the Multi-Disciplinary committee on Mission 3000 MT by the year 2027 - Railway Bridge Works for Western Dedicated Freight Corridor & Eastern Dedicated Freight Corridor thereupon.
05.05.2022
Channel of Submission (Civil Engineering Directorate - B&S)
2021/14/CE-III/BR/1/Monsoon 18.04.2022 Monsoon Precautions (2022-23)
2014/CE-III/BR/Bridge Workshop Policy 07.02.2022 Fabrication of Girders through Bridge Workshops.
2015/CE-III/BR/Substructure Code 19.01.2022 Construction of RCC Boxes for Railway Bridges.
12.11.2021
Construction of New Bridge during doubling
03.11.2021
Construction of RCC Boxes for Railway Bridges.
28.10.2021
Approval of bridge designs and drawings for works being executed by RVNL
09.09.2021
Delegation of Steel Girder Fabrication inspection to Zonal Railways and strengthening of delegation.
26.07.2021
Difficulty in inspection of Bridge Girders and related items due to surge in Covid cases
19.07.2021
Approval of GADs and Design of Bridges being constructed by PSUs
11.06.2021
4D BrIM based Inspection of Railway Bridges using 3D Bridge Information Model with unmanned Aerial System (Drone) and dove-tailing it with web enabled Bridge Management System (BMS)
17.05.2021
Approval of Bridge Drawings/Designs for Bridge works being executed by Railway and Other PSUs/Organizations.
13.05.2021
Instrumentation of Railway Bridges 
09.04.2021
Monsoon Precaution(2021-22) 
12.03.2021
Execution of Bridge, ROB, RUB, FOB & Rail Flyover works affecting running lines.
09.03.2021
Provision of Boards for FOBs and Bridges
08.03.2021
3D Scanning of Riverbed. 
 
 
 
26.02.2021
IR Bridge Manual, Edition-1998, amendment of Advance Correction Slip No-34, Para225 “Tractive Effort Limitation”
12.02.2021
Design of Non-Standard composite Girders for ROBs
27.01.2021
Guidelines for Load Testing of Bridges 
15.01.2021
3rd Party Audit of Railway Bridges/ROBs/FOBs 
23.11.2020
Boards on ROBs/FOBs & at stations for Railway Bridges
21.09.2020
Design of Non –Standard composite Girder for ROB
11.03.2020
Construction of RCC Boxes for Railway Bridges
12.02.2020

 

 
DBR and TAG
 

 

07.02.2020

 

 

 

Implementation of Modern technology for inspection of Bridges.

 

 

 

 

 

07.01.2020

 

 

 

Use of TELS on the Bridge in HHP Diesel & Electric locomotives.

 

 

 

 

 

03.01.2020

 

 

 

Guidelines for Instrumentation of Bridges

 

 

 

 

 

26.12.19

 

 

 

3 D Scanning of Riverbed.

 

 

 

 

 

17.12.19

 

 

 

Inspection of Railway Bridges (ROBs) before commissioning.

 

 

 

 

 

05.12.19

 

 

 

Inspection of Foot Over Bridges (FOBs).

 

 

 

 

 

19.11.19

 

 

 

Bridge Management System (BMS) on IR.

 

 

 

 

 

11.11.19

 

 

 

Approval of design basis of important Bridges by RDSO.

 

 

 

 

 

04.11.19

 

 

 

Stainless Steel for Structural Application.

 

 

 

 

 

25.10.19

 

 

 

Duty List of SAG Officers under the control of CPD/BW.

 

 

 

 

 

25.10.19

 

 

 

Use of Drone Mounted cameras for inspection of Bridges.

 

 

 

 

 

03.09.19

 

 

 

Provision of Boards.

 

 

 

 

 

26.09.19

 

 

 

Duty List of CPD/BW and SAG Officers under the control of CPD/BW.

 

 

 

 

 

18.09.19

 

 

 

Safety Audit.

 

 

 

 

 

24.07.19

 

 

 

Inspection of new steel Bridge Girders.

 

 

 

 

 

15.07.19

 

 

 

Fabrication, Supply and fabrication of Steel Girders for ROBs.

 

 

 

 

 

27.06.19

 

 

 

Inspection and Maintenance.

 

 

 

 

 

17.06.19

 

 

 

Award of Engineering Shield- Marking Scheme.

 

 

 

 

 

16.05.19

 

 

 

Permissible Carrying Capacity (PCC) of Wagons.

 

 

 

 

 

05.12.07

 

 

 

Running of freight trains in 25 Tonne Axel Load Route.

 

 

 

 

 

09.05.19

 

 

 

Supply of Steel Girders.

 

 

 

 

 

10.04.19

 

 

 

Inspection and Maintenance.

 

 

 

 

 

08.04.19

 

 

 

Provision of Boards.

 

 

 

 

 

28.03.19

 

 

 

Implementation of New Technologies-Bridges.

 

 

 

 

 

13.02.19

 

 

 

Implementation of New Technologies-Bridges.

 

 

 

 

 

20.12.18

 

 

 

Use of Standard Service Girders.

 

 

 

 

 

18.12.18

 

 

 

Fabrication of Road Over Bridge (ROB) Girder for Railway Span and Foot Over Bridge (FOB) Girder.

 

 

 

 

 

26.10.18

 

 

 

Use of Modern technology in Bridge inspection.

 

 

 

 

 

18.09.18

 

 

 

Construction of RCC Boxes for the Railway Bridges.

 

 

 

 

 

03.08.18

 

 

 

Bridge Management System (BMS) on IR.

 

 

 

2017/07/CE-III/BR/Safety

03.08.2018

Third Party Audit of Railway Bridges/ ROBs/ FOBs.

2013/CE-III/BR/ IRBM

02.07.2018

Inspection of Railway Bridges/ROBs before commissioning

2018/22/CE-III/BR/ Sidings

09.05.2018

Approval of GADs / detailed drawings of bridges for Private Sidings

2013/CE-III/BR/IRBM

28.03.2018

Inspection of RUB/LHS by ADEN/DEN/Sr. DEN during monsoon.

2015/CE-III/BR/Audit para 02/Pt.

08.12.2017

Audit Para Chapter 1 of CAG Report No. 24 of 2015 (Vol.II) review on Maintenance of Bridges in Indian Railway.

2017/02/ CE-III/BR/ Misc.

08.12.2017

Execution of Bridge Rehabilitation Works/RUBs/ROBs and Strengthening of Bridge Organisation

2016/14/CE-III/BR/Audut Para/37

27.10.2017

Delay in construction of railway bridges on replacement account

2017/41/CE-III/BR/ORN Bridges

21.09.2017

Inspection and rehabilitation of ORN-1 2 Bridges.

2015/CE-III/BR/RAW

11.09.2017

Inspection & Maintenance of Railway Affecting Works ( RAWs) and Liaison with Railways.

2016/52/CE-III/BR/Safety

24.08.2017

Safety  precautions and prevention/ readiness for Accident

2017/29/CE-III/BR/  Br.588/ECOR

03.08.2017

Construction of Bridges during doubling

2015/CE-III/BR/  Sub Structure Code

31.07.2017

Correction Slip No. 35  to Indian Railway Bridge Manual

2014/CE-III/BR/ Bridge Policy

31.07.2017

Use of Spherical Bearing for long span Bridge girders

2017/10/CE-III/BR/PSC Slab

20.06.2017

Replacement of Steel Girders upto 9.15m by PSC Slabs

2017/16/CE-III/BR/Girder Inspection

26.05.2017

Inspection of new steel Bridge Girders.

2015/CE-III/BR/Sub-Structure Code

26.05.2017

Retention of existing Free board.

2017/16/CE-III/BR/Girder Inspection

25.05.2017

Welders Qualification Test (WQT) procedure for fabrication of Steel Bridge Girders.

2017/16/CE-III/BR/Girder Inspection

17.05.2017

Use of Phased Ultrasonic Testing (PAUT) in NDT testing of Butt welds in fabrication of steel Bridge Girders

2017/16/CE-III/BR/Girder Inspection

19.05.2017

Use of phased array ultrosonic testing (PAUT) in NDT testing of butt welds in febrication of steel bridge girder.

2017/13/CE-III/BR/Monsoon

27.04.2017

Monsoon Precatutions 2017-18.

2015/CE-III/BR/Workshop Review Committee Report

23.03.2017

Committee Report on Holistic Review of Civil Engineering Workshop ( Bridge workshops on Indian railway

2014/CE-III/BR/Bridge Policy

09.03.2017

Approval of design basis of Important Bridges by RDSO

2014/CE-III/BR/Bridge Policy

15.11.2016

Type of Foundation for Railway Bridges

2016/31/CE-III/BR/ WP/2016-17

28.07.2016

Proper framing of Works Programme proposals under PH-32 Bridge Works.

2014/CE-III/BR/Bridge workshop Policy

08.06.2016

Fabrication of Bridge Girders & FOB  through Bridge Workshops.

2016/23/CE-III/BR/ Monsoon

06.06.2016

Stability of Cutting

2014/CE-III/BR/ Bridge Policy

04.12.2015

Guide line for repair rehabilitation / rebuilding of Bridges.

2015/CE-III/BR/RDSO/Misc.

01.12.2015

Protection arrangements for RCC Box Culverts & RUB / LHS.

2015/CE-III/BR/ River protection work

16.11.2015

Status & Maintenance of Guide bunds of Railway bridges.

2012/CE-III/BR/ Rly. Federation

29.10.2015

Provision of man refuges on girder bridges

2015/CE-III/BR/ Misc. Issues

13.10.2015

Provision /  availability of Binoculars for Bridge Inspection

2009/CE-I/BR/-III/3/ BMS

21.09.2015

Feeding of Bridge Management (Master Data)

2014/CE-III/BR/ Bridge Policy

09.09.2015

Measurement of longitudinal movement of Bridge bearings

2014/CE-III/BR/ Bridge Policy

31.08.2015

Use of High Strength Friction Grip (HSFG) bolts on Indian Railways

2015/CE-III/BR/ Water Level Gauge

02.07.2015

Installation of Water level monitoring system at Railway Bridges

2014/CE-III/BR/ Bridge Policy

25.06.2015

Availability of relieving girder in adequate  nos.

2014/CE-III/BR/ Bridge Policy

29.05.2015

Construction of Road Under Bridge (RUBs)

2013/CE-III/BR/ IRBM

12.05.2015

Approval of General Arrangement Drawing (GAD) of major Bridges on DFCCIL alignment.

2014/CE-III/BR/ Bridge Policy

21.04.2015

Span arrangement of Railway Bridge

2014/CE-III/BR/ Bridge Policy.

19.02.2015

Inspection of POT – PTFE bearings.

2014/CE-III/BR/ Bridge Policy

04.02.2015

Calculation of water ways, foundation design etc.

2014/CE-III/BR/ Speed Restriction

22.09.2014

Time bound action plan for reducing temporary as well as permanent speed restrictions on bridges.

2014/CE-III/BR/ Bridge Policy

 

09.10.2014

 

Providing necessary inspection arrangements for new bridges.

 

2013/CE-III/BR/ RDSO/Misc

 

 

15.09.2014

 

 

Adoption of Open foundation for railway bridge

 

 

2013/CE-III/BR/ RDSO/Misc

 

 

11.08.2014

 

 

Use of Standard drawings on railway system

 

 

2014/CE-III/BR/ WP 2015-16

 

 

23.07.2014

 

 

Proper framing of Works Programme proposals under PH-32 Bridge Works

 

 

2013/CE-III/BR/ RDSO/Misc

 

 

04.06.2014

 

 

Planning of new important bridges

 

 

2014/CE-III/BR/ Bridge Workshops Policy

 

 

24.02.2014

 

 

Nomination of Bridge Workshops – Secondary source.

 

 

RDSO’s letter No. CBS/INSP/WBG

 

 

12.09.2013

 

 

Inspection of Steel Bridge Girders- Quality Control Thereof.

 

 

99/CE-I/Misc/23 (IRBM) Pt I

 

 

17.05.2013

 

 

Approval of GADs of bridges for the lines executed by RVNL.

 

 

2012/CE-III/BR/Estimates/5/ECR

 

 

01.04.2013

 

 

Sanction of detailed Estimates

 

 

RDSO’s letter no CBS/Insp/WBG

 

 

08/09.11.12

 

 

Inspection of welded girders- quality control thereof.

 

 

2011/CE-I/BR/Monsoon/NR

 

 

30.08.2011

 

 

Bridges with Well/Pile foundations- Fixing of Safe Scour Depth.

 

 

2009/CE-I/BR/Safety(MR)

 

 

13/12/2010

 

 

RUBs-Provisions of Covers to prevent falling of waste /Garbages on road users

 

 

RDSO’s letter no CBS/PATHWAY

 

 

22/23.09.2010

 

 

Man Refuge on through open web girder bridges.

 

 

2007/CE-I/BR-III/3

 

 

07.06.2010

 

 

Estimation of Design Discharge

 

 

2002/CE-I/BR-III/11 (RDSO)

 

 

07.12.2009

 

 

Fabrication inspection of steel bridge girders.

 

 

RDSO’s letter no CBS/DPG/1

 

 

19.10.2009

 

 

Use of 30.5M Composite Girder welded type on Indian Railways.

 

 

2017/07/CE-III/BR/Safety 03.08.2018 Third Party Audit of Railway Bridges/ ROBs/ FOBs.
2013/CE-III/BR/ IRBM 02.07.2018 Inspection of Railway Bridges/ROBs before commissioning
2018/22/CE-III/BR/ Sidings 09.05.2018 Approval of GADs / detailed drawings of bridges for Private Sidings
2013/CE-III/BR/IRBM 28.03.2018 Inspection of RUB/LHS by ADEN/DEN/Sr. DEN during monsoon.
2015/CE-III/BR/Audit para 02/Pt. 08.12.2017 Audit Para Chapter 1 of CAG Report No. 24 of 2015 (Vol.II) review on Maintenance of Bridges in Indian Railway.
2017/02/ CE-III/BR/ Misc. 08.12.2017 Execution of Bridge Rehabilitation Works/RUBs/ROBs and Strengthening of Bridge Organisation
2016/14/CE-III/BR/Audut Para/37 27.10.2017 Delay in construction of railway bridges on replacement account
2017/41/CE-III/BR/ORN Bridges 21.09.2017 Inspection and rehabilitation of ORN-1 2 Bridges.
2015/CE-III/BR/RAW 11.09.2017 Inspection & Maintenance of Railway Affecting Works ( RAWs) and Liaison with Railways.
2016/52/CE-III/BR/Safety 24.08.2017 Safety  precautions and prevention/ readiness for Accident
2017/29/CE-III/BR/  Br.588/ECOR 03.08.2017 Construction of Bridges during doubling
2015/CE-III/BR/  Sub Structure Code 31.07.2017 Correction Slip No. 35  to Indian Railway Bridge Manual
2014/CE-III/BR/ Bridge Policy 31.07.2017 Use of Spherical Bearing for long span Bridge girders
2017/10/CE-III/BR/PSC Slab 20.06.2017 Replacement of Steel Girders upto 9.15m by PSC Slabs
2017/16/CE-III/BR/Girder Inspection 26.05.2017 Inspection of new steel Bridge Girders.
2015/CE-III/BR/Sub-Structure Code 26.05.2017 Retention of existing Free board.
2017/16/CE-III/BR/Girder Inspection 25.05.2017 Welders Qualification Test (WQT) procedure for fabrication of Steel Bridge Girders.
2017/16/CE-III/BR/Girder Inspection 17.05.2017 Use of Phased Ultrasonic Testing (PAUT) in NDT testing of Butt welds in fabrication of steel Bridge Girders
2017/16/CE-III/BR/Girder Inspection 19.05.2017 Use of phased array ultrosonic testing (PAUT) in NDT testing of butt welds in febrication of steel bridge girder.
2017/13/CE-III/BR/Monsoon 27.04.2017 Monsoon Precatutions 2017-18.
2015/CE-III/BR/Workshop Review Committee Report 23.03.2017 Committee Report on Holistic Review of Civil Engineering Workshop ( Bridge workshops on Indian railway
2014/CE-III/BR/Bridge Policy 09.03.2017 Approval of design basis of Important Bridges by RDSO
2014/CE-III/BR/Bridge Policy 15.11.2016 Type of Foundation for Railway Bridges
2016/31/CE-III/BR/ WP/2016-17 28.07.2016 Proper framing of Works Programme proposals under PH-32 Bridge Works.
2014/CE-III/BR/Bridge workshop Policy 08.06.2016 Fabrication of Bridge Girders & FOB  through Bridge Workshops.
2016/23/CE-III/BR/ Monsoon 06.06.2016 Stability of Cutting
2014/CE-III/BR/ Bridge Policy 04.12.2015 Guide line for repair rehabilitation / rebuilding of Bridges.
2015/CE-III/BR/RDSO/Misc. 01.12.2015 Protection arrangements for RCC Box Culverts & RUB / LHS.
2015/CE-III/BR/ River protection work 16.11.2015 Status & Maintenance of Guide bunds of Railway bridges.
2012/CE-III/BR/ Rly. Federation 29.10.2015 Provision of man refuges on girder bridges
2015/CE-III/BR/ Misc. Issues 13.10.2015 Provision /  availability of Binoculars for Bridge Inspection
2009/CE-I/BR/-III/3/ BMS 21.09.2015 Feeding of Bridge Management (Master Data)
2014/CE-III/BR/ Bridge Policy 09.09.2015 Measurement of longitudinal movement of Bridge bearings
2014/CE-III/BR/ Bridge Policy 31.08.2015 Use of High Strength Friction Grip (HSFG) bolts on Indian Railways
2015/CE-III/BR/ Water Level Gauge 02.07.2015 Installation of Water level monitoring system at Railway Bridges
2014/CE-III/BR/ Bridge Policy 25.06.2015 Availability of relieving girder in adequate  nos.
2014/CE-III/BR/ Bridge Policy 29.05.2015 Construction of Road Under Bridge (RUBs)
2013/CE-III/BR/ IRBM 12.05.2015 Approval of General Arrangement Drawing (GAD) of major Bridges on DFCCIL alignment.
2014/CE-III/BR/ Bridge Policy 21.04.2015 Span arrangement of Railway Bridge
2014/CE-III/BR/ Bridge Policy. 19.02.2015 Inspection of POT – PTFE bearings.
2014/CE-III/BR/ Bridge Policy 04.02.2015 Calculation of water ways, foundation design etc.
2014/CE-III/BR/ Speed Restriction 22.09.2014 Time bound action plan for reducing temporary as well as permanent speed restrictions on bridges.
2014/CE-III/BR/ Bridge Policy

 

09.10.2014

 

 
Providing necessary inspection arrangements for new bridges.

 

 

 

15.09.2014

 

 

 

Adoption of Open foundation for railway bridge

 

 

 

 

 

11.08.2014

 

 

 

Use of Standard drawings on railway system

 

 

 

 

 

23.07.2014

 

 

 

Proper framing of Works Programme proposals under PH-32 Bridge Works

 

 

 

 

 

04.06.2014

 

 

 

Planning of new important bridges

 

 

 

 

 

24.02.2014

 

 

 

Nomination of Bridge Workshops – Secondary source.

 

 

 

 

 

12.09.2013

 

 

 

Inspection of Steel Bridge Girders- Quality Control Thereof.

 

 

 

 

 

17.05.2013

 

 

 

Approval of GADs of bridges for the lines executed by RVNL.

 

 

 

 

 

01.04.2013

 

 

 

Sanction of detailed Estimates

 

 

 

 

 

08/09.11.12

 

 

 

Inspection of welded girders- quality control thereof.

 

 

 

 

 

30.08.2011

 

 

 

Bridges with Well/Pile foundations- Fixing of Safe Scour Depth.

 

 

 

 

 

13/12/2010

 

 

 

RUBs-Provisions of Covers to prevent falling of waste /Garbages on road users

 

 

 

 

 

22/23.09.2010

 

 

 

Man Refuge on through open web girder bridges.

 

 

 

 

 

07.06.2010

 

 

 

Estimation of Design Discharge

 

 

 

 

 

07.12.2009

 

 

 

Fabrication inspection of steel bridge girders.

 

 

 

 

 

19.10.2009

 

 

 

Use of 30.5M Composite Girder welded type on Indian Railways.

 

 

 

 

 

28.05.2009

 

 

 

Adoption of steel super structure of bridges for spans more than 24.4m.
 
 
 
 
 
 

 

 

 

 
 
 
 
 
 

 

Channel of Submission (Civil Engineering Directorate - B&S)

 

 

 

 

 

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 11-08-2025  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.