File No.
|
Date
|
Subject
|
2012/CE-IV/Misc/35(GAD of ROBs)
|
07.08.2012
|
Approval of GAD of ROBs
|
97/CE-I/BRO/158(Policy)Pt.II
|
09.07.2012
|
Precautions and Safety measures to be observed during execution of ROB/RUB works.
|
98/CE-I/Misc.(14)/BRO
|
03.07.2012
|
Clarification on maintenance charges in construction of Grade Separators sanctioned on deposit terms.
|
2012/E(LL)/HER/23
|
28.06.2012
|
Mimimum number of gatekeepers at a level crossing.
|
2006/CE-IV/Misc-2(RUBs)
|
13.06.2012
|
Clarification on provision of Subways/RUBs in liue of Level Crossings.
|
2006/CE-IV/LX/WP/1
|
07.06.2012
|
Elimination of level crossings from New Projects being executed for New Line, GC and Doubling.
|
2010/CE-I/Misc./14/BRO/1(Pt.)
|
24.05.2012
|
Clarification on maintenance charges in construction of Grade Separators sanctioned on cost sharing basis.
|
2012/CE-IV/DFC/RSW/1
|
22.05.2012
|
Action plan and policy issues of Road Safety Works of Railways and DFC.
|
2006/CE-IV/Misc-2(RUBs)
|
18.04.2012
|
Clarificaiton on provision of subways /RUBs in lieu of Level Crossings.
|
2009/CE-I/BRO/194(Design)
|
03.04.2012
|
Use of PSC/composite girders, viaduct and pile/open foundation in ROB.
|
2012/CE-I/LX/WP/1
|
03.04.2012
|
Clarification: Elimination of level crossings from New Projects being executed for New Line, GC and Doubling.
|
2008/CE-I/Lx/Target 2010-11
|
06.03.2012
|
Creation of infrastructure for manning of unmanned level crossing v/s creation of post gateman & filling of vacant post.
|
2006/CE-IV/BRO/82/MPLADS (Policy)
|
24.02.2012
|
Modification in the existing MPLADS Guidelines.
|
2007/CE-IV/Misc./3 (Budget)/Pt.2
|
17.02.2012
|
Construction of ROB/RUBs on cost sharing basis-Reimbursement of State Govt’s share.
|
2012/CE-IV/DFC/RSW/1 (2007/Infra./6/8 Pt.II)
|
13.02.2012
|
Action plan and policy issues of Road Safety Works of Railways and DFC
|
2007/Infra/6/8/Pt-II
|
03.02.2012
|
Action plan and policy issues of Road Safety Works of Railways and DFC
|
|
Feb.2012
|
Report of High Level Safety Review Committee of Para No. 5.6 page from 69 to 72.
|
2007/CE-IV/BRO/NREGA
|
30.01.2012
|
Construction of Road under Bridges through funds provided under various schemes of the Central and State Govt.-extension of NAREGA policy
|
2010/CE-I/LX/196
|
27.01.2012
|
Provision of upgraded road surface at level crossings by using precase-fiber-reinforced RCC Block
|
2011/CE-IV/Traffic Block/ROB-RUB
|
23.01.2012
|
Joint Circular on Mega Traffic-Cum-Power blocks for construction of Grade Separators
|
2006/CE-IV/BRO/82/MPLADS (Policy)
|
19.01.2012
|
Construction of Road under Bridges through funds provided under various schemes of the Central and State Govt.-extension of MPLADS policy
|
2011/CE-I/Estt./24(ROB)
|
19.01.2012
|
Inclusion of Provision of Light Foot Ovder Bridge (FOB) or Limited Height subway (LHS) along with Road Over Bridge (ROB) for use by light vehicular traffic and pedestrians
|
2006/CE-IV/LX/WP/1
|
09.01.2012
|
Elimination of level crossings from New Line, Gauge Conversion, Doubling
|