Letter No. 

Subject

Date of Issue

  2018  
2017/M(L)/467/2 Punctuality loss of Mail/ Express on diesel locos for the month of August 2018. 14.09.2018
2004/M(L)/466/3501 180 days of failure of Diesel Locomotives (April-June 2018) 05.09.2018
2017/M(L)/466/5(801) Diesel loco actual availability for August 2018. 05.09.2018
2016/M(L)/466/5(801) Diesel loco availability targets for September 2018. 05.09.2018
2016/M(L)/466/5(801) Diesel loco availability targets for Aug 2018 21.08.2018
2017/M(L)/467/2 Punctuality loss of Mail/Exp on diesel locos for the month of July 2018. 16.08.2018
2017/M(L)/466/5(801) Diesel loco actual availability for July 2018. 10.08.2018
2017/M(L)/467/2 Punctuality loss of Mail/Exp on diesel locos for the month of June 2018. 18.07.2018
2016/M(L)/466/5(801) Diesel Loco availability targets for July 2018. 12.07.2018
2017/M(L)/466/5(801) Diesel Loco availability for the June 2018. 10.07.2018
2017/M(L)/467/2 Punctuality loss of Mail/ Express on Diesel locos for the month of May 2018. 15.6.2018
2016/M(L)/466/5(801) Diesel loco availability targets for June 2018. 08.6.2018
2017/M(L)/466/5(801) Diesel loco actual availability for May 2018. 11.6.2018
2004/M(L)/466/3501 Diesel loco failures on WS & PU account (within 180 days) Jan-Mar 18 Ist Quarter 31.05.2018
2017/M(L)/467/2 Punctuality loss of mail/Express on diesel locos for the month of April 2018. 14.5.2018
2016/M(L)/466/5(801) Diesel loco availability targets for May 2018. 10.05.2018
2017/M(L)/466/5(801) Diesel loco actual availability for April 2018. 09.05.2018
2016/M(L)/466/6(7) Equipment failures on diesel locomotive for March, 2018. 08.05.2018
2017/M(L)/467/2 Punctuality loss of Mail/ Express on Diesel locos for March 2018. 13.4.2018
2016/M(L)/466/6(7) Equipment failure on diesel loco for February 2018 10.04.2018
2017/M(L)/466/5(801) Diesel loco actual availability for April 2017 to March 2018. 09.4.2018
2016/M(L)/466/5(801) Diesel loco availability targets for April 2018. 09.4.2018
2018/M(L)/101/2(BG) pt. A Railway wise holding and other information of DEMU on IR as on 31.3.2018. 06.4.2018
2017/M(L)/467/2 Punctuality loss of Mail/ Express on Diesel Locos for the month of February 2018. 14.03.2018
2016/M(L)/466/6(7) Equipment failure on diesel account for January, 2018 08.03.2018
2017/M(L)/466/5(801) Diesel loco actual availability for April 2017 to February 2018. 07.03.2018
2016/M(L)/466/5(801) Diesel loco availability targets for March 2018. 06.03.2018
2004/M(L)/466/3501 180 days failures of Diesel Locomotives (Oct-Dec 2017) 27.02.2018
2017/M(L)/467/2 Punctuality loss of Mail/Express on Diesel locos for the month of January 2018. 15.02.2018
2016/M(L)/466/6(7) Equipment failure on diesel account for December 2017.  07.02.2018
2017/M(L)/466/5(801) Diesel loco actual availability for April 2017 to January 2018 02.02.2018
2016/M(L)/466/5(801) Diesel loco availability targets for February 2018 02.02.2018
2017/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos for the month of  December 2017. 12.01.2018
2017/M(L)/466/5(801) Diesel loco actual availability for April 2017 to December 2017. 08.01.2018
2016/M(L)/466/5(801) Diesel loco availability targets for January 2018. 05.01.2018
2016/M(L)/466/6(7) Equipment failure on Diesel loco account for November, 2017. 03.01.2018
2017
2017/M(L)/467/2  Punctuality loss of Mail/Express on diesel locos for the month of November 2017. 12.12.2017
2016/M(L)/466/5(801) Diesel loco actual availability for April 2017 to November 2017. 05.12.2017
2016/M(L)/466/5(801) Diesel loco availability targets for December 2017. 04.12.2017
2016/M(L)/466/6(7) Equipment failure on Diesel locomotive for October, 2017 01.12.2017
2004/M(L)/466/3501 180 Days failures in Diesel Locomotives (July-September, 2017) 30.11.2017
2017/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos for the month of October 2017. 13.11.2017
2015/Fuel/289/3 Specific Fuel Consumption on Indian Railways 09.11.2017
2015/Fuel/289/3 Monthly Information of Fuel Consumption 08.11.2017
2016/M(L)/466/5(801) Diesel loco availability targets for November, 2017 03.11.2017
2017/M(L)/466/5(801) Diesel loco actual availability for April, 2017 to October, 2017 01.11.2017
2016/M(L)/466/6(7)  Equipment failure on Diesel loco account up  to September,2017 01.11.2017
2016/M(L)/101/2(BG) pt.D Maintenance  Spare items for DEMUs 27.10.2017
2017/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos for the month of September 2017. 11.10.2017
2016/M(L)/466/6(7) Equipment failure on diesel  locomotive for August,2017 05.10.2017
2017/M(L)/466/5(801) Diesel loco actual availability for April 2017 to September 2017. 03.10.2017
2016/M(L)/466/5(801) Diesel loco availability targets for October , 2017 29.09.2017
2017/M(L)/467/2 Punctuality loss of MailExpress on diesel locos. 13.09.2017
2016/M(L)/466/5(801) Diesel loco availability targets for September, 2017 06.09.2017
2017/M(L)/466/5(801) Diesel loco actual availability for April 2017 to August 2017 04.09.2017
2016/M(L)/466/4 Approved Engine Crankcase Oil on IR for Alco and EMD locos. 07.09.2017
2016/M(L)/466/6(7) Equipment failure on Diesel locomotive for July, 2017. 01.09.2017
2004/M(L)/466/3501 180 Days failure in Diesel Locomotives (Apr-June'2017) 30.08.2017
2010/M(L)/466/7101 Prevention of accidents and SPAD incidents 22.08.2017
2017/M(L)/467/2 Punctuality of Mail/Express on diesel locos for the month of July 2017 11.8.2017
2016/M(L)/466/6(7) Equipment failure on Diesel loco account for June, 2017 08.8.2017
2017/M(L)/466/5(801) Diesel loco actual availability for April, 2017 to July, 2017. 08.8.2017
2016/M(L)/466/5(801) Diesel loco availability targets for August, 2017. 07.8.2017
2016/M(L)/466/19) Minutes of CMPEs Conference held on 14.06.2017 18.07.2017
2015/Fuel/281/10(5) Rationalization of fueling pattern of Indian Railways 13.07.2017
2017/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos for the month of June 2017. 13.07.2017
2016/M(L)/466/6(7) Equipment failure on diesel locomotive for April-May,2017  05.07.2017
2016/M(L)/466/5/(801) Diesel loco availability targets for July, 2017 05.07.2017
2017/M(L)/466/5(801) Diesel loco actual availability for April 2017 to June 2017.  05.07.2017
2015/M(L)/466/1(4A) Maintenance Spare planning for DEMU 23.06.2017
2015/M(L)/466/5(402) Maintenance spare for DEMUs 15.06.2017
2017/M(L)/467/2 Punctuality Loss of Mail/Express on diesel locos. 13.06.2017
2015/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 09.06.2017
2016/M(L)/466/5(801) Diesel Loco availability targets for June, 2017  05.06.2017
2017/M(L)/466/5(801 Diesel loco actual availability for April to May, 2017 05.06.2017
2016/M(L)/466/6(7) Equipment failure April, 2017 05.06.2017
2004/M(L)/466/3501 180 days failures of Diesel locos (Jan-Mar 2017) 29.05.2017
2015/Fuel/289/3 Specific Fuel Consumption on Indian Railways 12.05.2017
2017/M(L)/467/2 Punctuality loss of Mail/ Express on diesel locos for the month of April 2017. 12.5.2017
2009/M(L)/466/5(801) Diesel Loco availability targets for May, 2017. 08.5.2017
2017/M(L)/466/5(801) Diesel loco actual availability for April 2017. 02.5.2017
2016/M(L)/466/6(7) Equipment failures on Diesel locomotives for the period of April,2016- March 2017 01.05.2017
2007/M(L)/101/2 (BG) Pt.II Provision of FIBA in 1600 HP DEMU Coaches. 13.04.2017
2017/M(L)/467/2 Punctuality Loss of Mail/Express on Diesel Locos. 11.04.2017
2015/Fuel/289/3 Specific Fuel consumption of diesel locomotives. 10.04.2017
2009/M(L)/466/5(801) Diesel loco actual availability for April 2016 to March 2017. 06.04.2017
2009/M(L)/466/5(801) Diesel loco availability targets for April, 2017. 05.04.2017
2016/M(L)/466/(19) CEEs/CMPEs/CRSE (O&F)s Conference on 05.4.2017 through Video Link 30.03.2017
2016/M(L)/466/3(33) Allotment of Rehabilitated Engine Blocks for  the year 2017-18 29.03.2017
2016/M(L)/466/6(7) Equipment failures on diesel locomotive for the period April-2016 to Faburary,2017 29.03.2017
2015/(M(L)/466/1(4A) Minutes of 5th Bulk indent meeting held on 3rd March, 2017 28.03.2017
2016/M(L)/466/19/1 policy Condemnation of Locos and DEMUs 17.03.2017
2017/M(L)/467/2 Punctuality loss of Mail /Express on Diesel Locos for the Month of February 2017. 10.03.2017
2016/M(L)/466/5(801) Diesel Loco actual availability for April 2016 to February 2017. 06.03.2017
2009/M(L)/466/5(801) Diesel loco availability Targets for March, 2017. 06.03.2017
2016/M(L)/466/6(7) Equipment Failure on Diesel Locomotive. 28.02.2017
2004/M(L)/466/3501 180 days failures of Diesel Locomotives (Oct-Dec'2016) 27.02.2017
2017/M(L)/467/2 Punctuality Loss of Mail/Express on Diesel Locos for Month of January 2017 13.02.2017
2016/M(L)/466/5(801) Diesel loco actual availability for April 2016 to December 2017. 08.02.2017
2009/M(L)/466/5(801) Diesel loco availability targets for Feb,2017. 03.02.2017
2016/M(L)/466/6(7) Equipment failures on diesel locomotive. 03.02.2017
2014/M(L)466/1 (2705) Rebuilding programme of diesel locos at DMW/PTA during 2017-18 19.01.2017
2015/M(L)/466/1 Pt.(A) Homing of Electric Locomotives & MEMUs in Diesel Sheds & DEMU sheds respectively and vice versa. 19.01.2017
2017/M(L)/467/802 Punctuality loss of M/Exp. on diesel locos  for December 2016. 12.01.2017
2009/M(L)/466/5(801) Diesel locos availability Target for January 2017. 04/01/2017
2016/M(L)/466/801 Diesel locos actual availability for December 2017. 04/01/2017
2016/M(L)/466/6(7)

Equipment failure  on diesel locomotive for the period of April 2016-November 2016

02.01.2017
2016
2015/Fuel/289/3 Fuel economy measures on Indian Railways 22.12.2016
2016/M(L)/466/19 pt. Minutes of Meeting of CMPEs/ CRSEs Conference held through Video link on 13.12.2016. 15/12/2016
2015/M(L)/467/2

Punctuality loss of M/Exp. on diesel locos

13.12.2016
2009/M(L)/466/5(801) Diesel loco availability targets for December 2016  02.12.2016
2015/M(L)/466/19 Corrigendum  for minutes of CMPEs Conference held at Railway Board on 14.11.2016  01.12.2016
2016/M(L)/466/5(801) Diesel loco actual availability for November 2016  01.12.2016
2015/M(L)/466/6(7) Equipment failures on Diesel locomotives for April- October,2016. 30.11.2016
2004/M(L)/466/3501 180 Days Failures of Diesel Locomotives (July-Sept. 2016) 29.11.2016
2015/M(L)/466/16 Pt. Minutes of the CMPE’s Conference held on 14th November, 2016 at Rail Bhawan. 17.11.2016
2016/M(L)/467/2

Punctuality loss of Mail/Express on Diesel loco

10.11.2016
2015/M(L)/466/19 CMPEs Conference at Railway Board on 14th November 2016. 10.11.2016
2015/Fuel/289/3 Consump;tion and expenditure on HSD. 09.11.2016
2015/Fuel/289/3 Specific Fuel Consumption on Indian Railways 08.11.2016
2016/K(L)/467/2 Revision of RDSO table for calculation of time loss due to speed restrictions 07.11.2016
2009/M(L)/466/5/(801) Diesel loco availability targets for November, 2016. 04.11.2016
2009/M(L)/466/5/(801) Diesel loco actual availability for October, 2016. 03.11.2016
2016/M(L)/467/6/(7) Equipment failure on diesel locomotive for the month of September, 2016. 25.10.2016
2015/M(L)/466/1(4)’A’ Minutes of meeting of ‘Customer Interaction Meet’ held on 05.10.2016 at DMW, Patiala. 25.10.2016
2015/Fuel/282/15 Pt. Joint Procedure Order (JPO) between NWR and M/s BPCL for receipt stocking and issue of HSD oil in new RDI at UP side Jaipur, on the concept of Total Fuel Management (TFM). 21.10.2016
2015/Fuel/289/3 Specific Fuel Consumption on Indian Railways 21.10.2016
2006/M(L)/466/3(1209) WDS6/6R Minutes of coordination meeting regarding WDS6 Loco Production held on 06.10.2016 at DMW/Patiala 20.10.2016
2015/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos for the month of September 2016 13.10.2016
2009/M(L)/466/5(801) Diesel loco actual availability targets for Oct. 16. 05.10.2016
2009/M(L)/466/2(801) Diesel loco actual availability for Sept. 16. 03.10.2016
2016/M(L)/466/12(19) Action plan for improving reliability of HHP Locomotives. 04.10.2016
2016/M(L)/466/6(7) Equipment failure on diesel locomotive for August 2016 28.9.2016
2016/M(L)/165/3 Implementation plan of recommendations of high power committee (HPC). 22.09.2016
2015/M(L)/467/2 Punctuality loss of mail /Express on diesel locos for the month of August, 2016 14.09.2016
2016/M(L)/466/6(7) Equipment failures on diesel locomotive for the month of July 2016. 12.9.2016
2016/M(L)/466/5(18) CME’s Conference-October. 2016. 05.09.2016
2009/M(L)/466/5(801) Diesel loco availability target for September 2016. 05.09.2016
2009/M(L)/466/5(801) Diesel locos actual availability for August 2016. 01.09.2016
2007/M(L)/101/2(BG) Revision in Maintenance Schedules for 1400/1600 HP DEMU. 01.09.2016
2014/Fuel/282/19 Breakup of Landed Price. 31.08.2016
2004/M(L)/466/3501 180 days failure of Diesel Locomotives (April-June 2016). 29.08.2016
2015/M(L)/467/1 Analysis of Diesel locomotives failures 26.08.2016
2003/M(L)/466/20 Misutilisation and unnecessary dead movement of diesel locomotives. 26.08.2016
2010/M(L)/466/7101 Calling out of signals by loco crew. 12.08.2016
2013/M(L)/467/2 Punctuality loss of Mail /express on Diesel locos.  12.08.2016
2016/M(L)/466/6(7) EQUIPMENT FAILURES ON DIESEL LOCOMOTIVE 05.08,2016
2009/M(L)/466/5(801) Diesel loco availability targets for August, 2016. 03.8.2016
2009/M(L)/466/5(801) Diesel locos actual availability for April 2016 to July,2016 02.8.2016
2016/M(L)/165/3 IMPLEMENTION OF RECOMMENDATIONS OF HIGH POWER COMMITTEE(HPC) 21.07.2016
2013/M(L)/467/2)  Punctuality loss of M/Express on diesel loco. 11.07.2016
2009/M(L)466/5(801) Revised Diesel loco availability targets for July, 2016. 06.07.2016
2015/M(L)/467/2) Inter Railway technical audit of Diesel Loco Sheds. 04.07.2016
2009/M(L)/466/5(801) Diesel loco availability target for July 2016. 01.07.2016
2009/M(L)/466/5(801) Diesel loco actual availability for June 2016. 01.07.2016
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 27.06.2016
2014/M(L)/466/15 Faster proliferation of APU with modification kit in 500 locos under RSP. 24.06.2016
2015/M(L)/466/6(7) Equipment failures on diesel locomotive for the period of April – May, 2016. 24.06.2016
2013/M(L)/467/2  Punctuality loss of M/Exp. On diesel loco for May 2016. 10.06.2016
2014/M(L)/101/2(BG) Pt. D Specific Fuel consumption (SFC) of DEMUs IR. 08.06.2016
2015/M(L)/466/3(33) Allotment of rehabilitated Engine blocks for the year 2016-17 25.05.2016
2009/M(L)/466/5(801) Diesel loco availability targets for June, 2016 02/06/2016
2009/M(L)/466/5(801) Diesel loco actual availability for May 2016 02/06/2016
2015/Fuel/289/3 Minutes of the meeting held in Railway Board on 24.05.2016 regarding Fuel economy measures on IR 02.06.2016
2015/M(L)/466/14 Pt. Special repair of accident damaged HHP Diesel locomotives 02.06.2016
2004/M(L)/466/3501 180 Days failure of Diesel Locos (Jan-Mar-2016) 31.05.2016
2016/M(L)/466/6(7) EQUIPMENT FAILURE ON DIESEL LOCOMOTIVE 25.05.2016
2016/M(L)/466/ Minutes of CME’s Conference held on 22nd and 23rd April 2016 at Ooty /SRly. 20/05/2016
2015/M(L)/466/1(4A) Corrigendum to Minutes of 4th Bulk Indent Meeting held at DMW on 18th March, 2016.  09/05/2016
2013/M(L)/467/2 Punctuality loss of Mail/Express on Diesel Locos for the period of  April 2016 10/05/2016
2013/M(L)/467/2 Diesel loco actual availablity April 2016 05/05/2016
2009/M(L)/466/5(801) Diesel loco availability targets for May, 2016. 09/05/2016
2015/Fuel/289/3 Fuel Economy measures on IR 05.05.2016
2016/M(L)/466/6(7) Equipment failures on Diesel Locomotive. 27/04/2016
2003/M(L)/466/18 Minutes of meeting of NG locomotives held on 12.04.16.. 18.04.2016
2016/M(L)/466/5(18) Supplementary Agenda for CMEs’ Conference-April, 2016. 13/04/2016
2013/M(L)/467/2 Punctuality loss of Mail/ Express on diesel locos for the month of March 2016. 12/04/2016
2016/M(L)/101/2(BG)/Pt.D Status of DEMUs in Railways as on.31.3.2016 07.4.2016
2016/M(L)/466/5(18) Agenda for CMEs’ Conference-April, 2016. 07.04.2016
2015/M(L)/466/1(4A) Minutes of 4th Bulk Indent Meeting held at DMW on 18th March 2016 06.04.2016
2014/M(L)/466/11 Training on HHP Diesel Locomotive Simulators. 04/04/2016
2009/M(L)/465/ 5(801) Diesel loco actual availability for March 2016. 04/04/2016
2009/M(L)/465/ 5(801) Diesel loco avail. Target for April 2016. 04/04/2016
2016/M(L)/466/6(7) Equipment Failure of diesel locomotive. 30.03.2016
2016/M(L)/466/5(18) CME,s Conference- April ,2016 29.03.2016
2016/M(L)/466/5(18) CME,s Conference- April ,2016 14.03.2016
2009/M(L)/467/ (2) Punctuality loss of M/EXP on diesel loco 10.03.2016
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 08.03.2016
2016/M(L)/466/5(18) CME,s Conference- April ,2016 04.03.2016
2009/M(L)/466/5(801) Diesel loco actual availability for February 2016 02/03/2016
2009/M(L)/466/5(801) Diesel loco availability targets for March, 2016 01/03/2016
2015/M(L)/466/6(7) Equipment failures on Diesel locomotive for the month of January 2016. 24/2/2016
2004/M(L)466/3501 Diesel Locomotives180 days failure (Oct.-Dec.2015) 23.02.2016
2013/M(L)/467/2 Punctuality loss of Mail Express on diesel locos for the month of January 2016. 10.02.2016
2014/M(L)/466/1 (2705) Rebuilding programme of diesel locos at DMW/PTA during 2016-17 . 04.02.2016
2015/M(L)/466/6(7) Equipment failures on Diesel lococomotive. 02.02.2016
2009/M(L)/466/5(801) Diesel loco availability targets for February. 2016 04.2.2016
2009/M(L)/466/5(801) Diesel loco actual availability for Jan. 2016. 02.2.2016
2014/M(L)/649/2 (Mech. Shield) Criteria of Mechanical Engineering Shield presented on the occasion of Railway Week National Award Function  . 19.01.2016
2015/M(L)/466/7101/4NR Modification for relocation of tapping of BP gauge in Diesel Locomotives. 18.01.2016
2013/M(L)/467/2 Punctuality loss of Mail / Express on diesel locos for the month of December 2015. 12/01/2016
2014/M(L)/101/2(BG)pt. D Minutes of Meeting on DEMU held on 28.12.2015 12.01.2016
2009/M(L)/466/5(801) Diesel loco availability targets for January, 2016. 04/01/2016
2009/M(L)/466/5(801) Diesel loco actual availability for December, 2015. 04/01/2016
  2015  
2014/M(L)/466/6(7) Equipment failures on diesel locomotive for the month of November 2015. 30/12/2015
2014/M(L)/466/7101/Misc. Maintenance/ working and usage of D1 emergency flap valve 21/12/2015
2013/M(L)/467/2 Punctuality loss of Mail/ Express on diesel locos for the month of November 2015. 10/12/2015
2009/M(L)/466/5(801) Diesel loco availability targets for December, 2015. 04/12/2015
2009/M(L)/466/5(801) Diesel loco actual availability for November 2015. 02/12/2015
2015/M(L)/466/6(7) Equipment failure on diesel locomotive . 01.12.2015
2004/M(L)/466/3501 180 days failure of Diesel Locomotives (July-Sept 2015). 01.11.2015
2015/M(L)/466/3(18) Minutes of CME’s Conference held on 26th & 27th October, 2015 at Mumbai. 27.11.2015
2015/M(L)/466/1(14)PT. Nomination of workshops for wheel re-discing/ re-profiling & overhauling of CTRBs of HHP Locos 26/11/2015
2015/Fuel/282/10(5) Standardisation of facilities at RCDs. 06.11.2015
2013/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos for the period October 2015. 10/11/2015
2015/M(L)/466/1(14) Procurement of spares of HHP locomotives. 05.11.2015
2009/M(L)/466/5(801) Actual availability for disell loco for April to October,2015 03/11/2015
No.2009/M(L)/466/5(801). Diesel locomotive availability targets for November, 2015. 03.11.2015
2014/101/2(BG)/pt D. Repair and Overhauling of Cummins make High Speed Engines of IR’s DEMU 30.10.2015
2015/466/6(7). Equipment failures diesel locomotive. 29.10.2015
2010/Tele/2(1)/1/Pt Analyzing of calls to and from CUG SIM’s allotted to Train crew between Sign ON and Sign OFF. 26.10.2015
2006/M(L)/467/2. Subsidized meal for running staff. 23.10.2015
2015/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 16/10/2015
2013/M(L)/467/2 Punctuality loss of Mail/Express on Diesel locos. 12/10/2015
2015/M(L)/466/3(18)

CMEs’ Conference to be held 26th & 27th Oct. 2015 at Mumbai.

06/10/2015
2015/M(L)/466/3(18) Agenda items part-2 (items for feedback only) for CMEs conference, 2015. 08/10/2015
2010/M(L)/466/7101

Monitoring and counseling of running staff by Loco Inspectors.

28.9.2015
2015/M(L)/466/3(18) Agenda for CMEs’ Conference 2015. 06/10/2015
2009/M(L)/466/5(801) Diesel loco availability targets for October, 2015. 05/10/2015
2009/M(L)/466/5(801) Diesel loco actual availability for September 2015. 05/10/2015
2015/M(L)/466/1(4) Tooling items for HHP Locomotives. 01.10.2015
2015/M(L)/466/6(7) Equipment failures on diesel locomotives. 01.10.2015
2015/M(L)/467/3 RDSO Load chart for Diesel–Electric locomotive for freight services. 01.10.2015
2004/M(L)/466/7101/Vol.III Fire prevention measures on Diesel Locomotives. 01.10.2015
RDSO/2015/EL/SPEC/0119,(Rev’0’)

Functional requirement specification for fuel cell sensor based breath alcohol analyser for general purpose use on Indian Railways.

17/09/2015
2013/M(L)/467/2 Punctuality loss of Mail Exp. On Diesel loco 11.09.2015
2015/M(L)/466/3(18)  REMINDER for CMEs’ Conference to be held on 26th & 27th Ocotober,2015 at Mumbai/WR 08.9.2015
2014/M(L)/101/2 (BG)Pt. A-1 Maintenance of DEMU. 02.09.2015
2015/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 07.09.2015
2015/Fuel/289/3 Separate SFC and failure data for ALCO and EMD locos. 07.09.2015
2015/M(L)/459/2 Pt Board Bulk RSP items in Pink Book/WB 2015-16 04.09.2015
2004/M(L)/466/3501 180 days failure of Diesel Locomotives (Apr-Jun 2015) 02.09.2015
2009/M(L)/466/5(801) Diesel loco actual availability for August 2015. 02.09.2015
2009/M(L)/466/5(801) Diesel loco availability targets for September, 2015 01.09.2015
2015/M(L)/466/6(7) Equipment failures on diesel locomotive. 01.09.2015
2015/M(L)/467/2 Time table changes for Mail/ Exp. trains from 01.10.2015 31.08.2015
2015/M(L)/467/2 On Line Diesel Punctuality Software Module for Monitoring of Diesel Punctuality. 28.08.2015
2015/M(L)/466/3(18) CMEs Conference to be held on 26th & 27th October, 2015 at Mumbai, WR 25.08.2015
2015/M(L)/466/19 Minutes of Chief Motive Power Engineers Conference held on
11th & 12th August 2015 at Railway board.
24.08.2015
2001/M(L)/466/75 Pt Sale/disposal of overaged/ condemned diesel locomotives. 20.08.2015
2009/M(L)/466/5(801) Revised Diesel loco availability targets for August, 2015 17.08.2015
2009/Fuel/289/3 Specific fuel consumption on Indian railways 13.08.2015
2015/M(L)/466/14 Maintenance policy for HHP locomotives 12.08.2015
2006/M(L)/467/2 Subsidized meal for running staff 12.08.2015
2013/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos for the period July 2015. 10.08.2015
2009/M(L)/466/5(801) Diesel loco actual availability for July 2015 03.08.2015
2009/M(L)/466/5(801) Diesel loco availability target for August, 2015. 03.08.2015
2015/M(L)/466/6(7) Equipment failures on diesel locomotive. 29.07.2015
2015/M(L)/466/19) CMPEs Conference at Railway Board on 11th and 12th August 2015. 28.07.2015
2015/M(L)/466/20 Performance of ALCO power pack. 28.07.2015
2015/M(L)/466/20 Modification on locos in 2015 28.07.2015
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways 27.07.2015
2015/Fuel/289/3 Seperate SFC data for ALCO & EMD locos. 24.07.2015
2010/Fuel/282/2pt.I(Dup) Implementation of 5% Biodiesel blending in Diesel 21.07.2015
2015/M(L)/466/1(4) Procurement policy of spares of HHP locomotives. 20.07.2015
2015/M(L)/466/5 Cleanliness drive in diesel Loco Sheds. 20.07.2015
2014/M(L)/467/3pt. Filling up the posts of Loco Inspectors. 20.07.2015
2015/M(L)/467/2 Inter Railway technical audit of Diesel  Loco Sheds. 20.07.2015
2015/M(L)/467/2 Punctuality & safety performance of Diesel  loco & crew during Ist quarter of 2015-16. 20.07.2015
2015/M(L)/466/6(7) Equipment failure on Diesel locomotive for period of April- May 2015. 14/07/2015
2013/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos for June 2015. 10.07.2015
2007/M(L)/101/2(BG)pt.II CRS Sanction for 1600 HHP DEMU. 08/07/2015
2015/E&HM/03/02 Environmental accreditation. 11/06/2015
2015/M(L)/101/2(BG)pt.A Status of DEMUs in Railways. 02.07.2015
2009/M(L)/466/5(801) Diesel loco availability targets for July 15 01/07/2015
2009/M(L)/466/5(801) Diesel loco actual availability for June 15 01/07/2015
2001/M(L)/466/75pt. Sale of overaged diesel Locomotives. 29.6.2015
2015M(L)/466/1(4) Procurement policy of spares of HHP locomotives 26.6.2015
2015/M(L)/101/2(BG)pt.C List of Stabled DPCs in Railways. 22.06.2015
2013/M(L)/467/2 Punctuality loss on Diesel Loco account. 18/06/2015
20009/M(L)/466/5(801) Revised Diesel loco availability targets for June 2015 12/06/2015
2014/M(L)/467/3 Training of Crew on cab changing procedure of Dual  cab locomotives 11/06/2015
2013/M(L)/4672 Punct. Loss of M/Exp on Diesel loco for May 2015 10/06/2015
2009/M(L)/466/5(801) Diesel loco availability targets for June 2015 08/06/2015
2015M(L)/466/6(7) Equipment failure  on Dsl locomotive for the month of April 2015

08.6.2015

2009/M(L)/466/5(801) Diesel loco actual availability May 15 01/06/2015
2014/M(L)/466/3(18) Minutes of CMEs’ Conference held on 24th and 25th April, 2015 at Shimla. 01/06/2015
2004/M(L)/466/3501 180 days Failure Jan.-Mar-2015. 29.05.2015
2015/M(L)/466/3(33) Allotment of rehabilitated Power for the year 2015-16. 22/05/2015
2014/M(L)/101/2(BG) DEMU Co-ordination Meeting at ICF. 15/05/2015
2015/M(L)/466/6(7) Asset failure of diesel locomotives. 14/05/2015
2015/M(L)/466/3(33) Allotment of rehabilitated Engine blocks for the year 2015-16. 12/05/2015
2013/M(L)/467/2 Punctuality loss of Mail/Express on Diesel locos of April 2015. 12/05/2015
2015/M(L)/466/6/(7) Equipment failures on diesel locomotive. 12/05/2015
2015/M(L)/459/2Pt Diesel loco Holding& Fund Req. 11/05/2015
2014/M(L)/466/1102/1 Bulk lube oil storage and dispensing facilities. 11/05/2015
2009/M(L)/466/5(801) Diesel loco availability Targets for May 2015. 07/05/2015
2009/M(L)/466/5(801) Diesel loco actual availability for April 2015. 06/05/2015
2003/M(L)/466/18 Allotment of two variants of HHP Locomotives in each shed. 30/04/2015
2014/M(L)/466/3(18) Agenda for CME Conference . 10/04/2015
2013/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 10/04/2015
2009/M(L)/466/5(801) Diesel loco availability Targets for April 2015. 07/04/2015
2009/M(L)/466/5(801) Diesel loco actual availability for April 2014 to march 2015. 07/04/2015
2015/M(L)/466/6(7) Equipment Failure on diesel locomotive. 31.03.2015
97/Safety-I/11/9

Working of Mail/Express trains by Loco Pilot (Goods) in emergency.

25/03/2015
2014/M(L)/466/7101.Misc. Shunting operation performed with Diesel Locomotives. 13.03.2015
2014/M(L)/466/3(18) CME’s Conference- April-2015. 19/03/2015
2015/M(L)/466/6(7) Equipment Failure on diesel locomotive. 10/03/2015
2013/M(L)/467/7(2) Punctulity loss of Mail/Express on diesel locos. 10/03/2015
2009/M(L)/466/5(801) Diesel loco availability Targets for March 2015. 05.03.2015
2009/M(L)/466/5(801) Diesel loco actual availability for Feb 2015. 05.03.2015
2010/Fuel/282/2 Pt.1 Action Plan for Implementation of 5% bio diesel blending in diesel 02.03.2015
2015/M(L)/466/7101 Handbook on “ Up-Keep of Combined Crew Lobby” 02.03.2015
2004/M(L)/466/3501 डीजल लोकोमोटिव की 180 दिनों के अंदर विफलता पुनःनिर्मित/नवनिर्मित 27.02.2015
2014/M(L)/101/2(BG)Pt.A Allotment of DEMU for the year 2014-15. 16.02.2015
2014/M(L)/466/3(18) Minutes of CME’s conference held on 12th & 13th November 2014 at Goa. 11.02.2015
98/M(L)/165/1ptIII(a) Environment Management in Workshop, shed & Production Units of Railways  10.2.2015
2013/M(L)/467/7(2) Punctuality loss of mail/Exp. on diesel loco for january2015 10.2.2015
2015/M(L)/466/6(7) Equipment Failure on diesel locomotive 05.02.2015
2009/M(L)/466/5(801) Diesel loco availability targets for Feb.2015. 03.02.2015
2009/M(L)/466/5(801) Diesel loco actual availability for January 2015. 02.02.2015
2010/Fuel/282/2Pt Direct sale of bio-diesel by manufacturers/suppliers other than OMC's 02.02.2015
2002/Fuel/282/3 Rationalisation of fueling pattern on Indian Railways 21.01.2015
2013/M(L)/466/6(7) Equipment failures on diesel locomotive. 20.01.2015
2007/Fuel/282/5 Pt. Ownership of RCDs 16.01.2015
2014/M(L)/459/2Pt Position of upgraded compressor fitted on Locomotives.

16.01.2015

2013/M(L)/467/7(2) Punctuality loss of Mail / Express on Diesel Locos for Dec.14. 12.01.2015

2015/M(L)/459/2Pt

Unit Exchange Spares for DEMUs 08/01/2015
2014/M(L)/466/1(4) Diesel loco (ALCO) – Bulk Indent Meeting at DMW/PTA. 07/01/2015
2015/M(L)/467/1 (Shield)  Shield for best maintained Running Room. 06.01.2015
2009/M(L)/466/5(801) Diesel loco availability targets for Jan. 2015. 06.01.2015
2009/M(L)/466/5(801) Diesel loco actual availability for December 2014 02.01.2015
  2014  
2013/Fuel/289/3 Specific Fuel Consumption on Indian Railways 30.12.2014
2014/M(L)/466/3(18) Agenda for CME’s Conference. 23.12.2014
2014/M(L)/466/3(18) CME's Conference on 29th December;2014 23.12.2014
2010/Fuel/282/2 Pt.1 Use of Bio-Diesel on IR 11.12.2014
86/M(L)/467/22 Loco Hire Charges. 11/12/2014
2013/M(L)/467/7(2) Punctuality loss of Mail / Express on Diesel Locos. 10.12.2014
2014/M(L)/101/2(BG)/Pt.D Postponement of DEMU Co-ordination Meeting at ICF. 10.12.2014
2014/M(L)/459/2 Pt. Fund against Sancioned P.B.2014-15 09.12.2014
2010/M(L)/466/7101 Accident cases on Loco Pilot account. 03.12.2014
2014/M(L)/101/2(BG)/Pt.D DEMU Co-ordination meeting at ICF 02.12.2014
2013/ M(L)/466/6(7) Diesel loco availability target Dec. 14 02.12.2014
2009/ M(L)/466/(801) Diesel loco actual availability Nov.14 02.12.2014
2013/ M(L)/466/6(7) Equipment failure Ap.14 to Oct.14 02.12.2014
2004/M(L)/466/3501 Diesel loco failure within 180 days Jul. 14-Sep. 14 28.11.2014
2014/M(L)/459/2pt. Fund allotment  28.11.2014
2014/M(L)/459/2 Pt. Replacement of Electro Mechanical Governor. 24.11.2014
2013/M(L)/466/6(7) Corrigendum for equipment failure on Diesel. Locomotive for September, 2014. 19.11.2014
2013/M(L)/4666(7) Equipment failures on diesel locomotive.  17.11.2014
2014/M(L)/466/3(18) Punct.loss of mail/Exp.on Diesel loco for Oct-14. 11.11.2014
2012/Safety(DM)/7/25 Accidents Due Signal Passing at Danger  28.10.2014
2009/M(L)466/5(801) Diesel loco actual availability for October 2014. 07.11.2014
2009/M(L)/466/5(801) Diesel loco Availability targets for November 2014. 07.11.2014
2014/M(L)466/3(18) Additional agenda for  CME conference November,2014 for items PH-42 & Project 07.11.2014
2014/E(Trg)/12/33 Annual Conference Bio-Fuels 2014 on 5th Nov,2014 at The Mansion, Hotel Hyatt Regency, New Delhi  03.11.2014
2014/M(L)/466/3(18) Agenda for CMEs Conference to be held on 12 & 13 Nov.2014 at SWR. 03.11.2014
2014/M(L)/466/19 Weekly status of condemnation of locomotives  31.10.2014
98/M(L)/466/29 VCD reset control on locomotives. 29.10.2014
2014/M(L)/467/3 Aptitude Test (earlier Psychological Test) in Department Selections. 15.10.2014
2014/M(W)/964/59 Works Programme 2014-15- out of turn proposals. 10.10.2014
2013/M(L)/466/6(7) Equipment failures on Diesel locomotive. 10.10.2014
2013/M(L)/467/7(2) Punctuality loss of Mail/Express on Diesel locos. 10.10.2014
2009/M(L)/466/5(801) Diesel loco availability targets for October 2014. 08.10.2014
2009/M(L)/466/5/801 Diesel loco actual availability for September 2014 07.10.2014
2004/M(L)/466/3501 Diesel locomotive failure within 180 days. 19/09/2014
2010/M(L)/466/08(3501) 180 days failure format for Diesel locos turned out from DLW/DMW & Workshops. 15/09/2014
2010/M(L)/466/6(35) Decision taken on DMG Meeting held at Chennai on 09-10th January 2014. 10/09/2014
2013/ACII/2/2 Allocation of expenditure on Bio-diesel & CNG/LNG 12.09.2014
2014/M(L)/466/3(18) Minutes of CME Conference  August 2014 11-09-2014
2013/M(L)/467/7(2) Punctuality Loss of Mail/Exp.on Dsl Loco of Aug-2014. 11/09/2014
2010/M(L)/466/6(35) Diesel Maintenance Group Meeting for ALCO locos. 09/09/2014
2010/M(L)/466/6(35) Postponement  of DMG meeting for ALCO & HHP loco 08/09/2014
2009/M(L)/466/5(801) Diesel loco Availability targets for September 2014. 02/09/2014
2013/M(L)/466/6(7) Equipment failures on diesel locomotive 02/09/2014
2010/M(L)/466/6(35) Diesel Maintenance Group Meeting for ALCO locos. 02/09/2014
2009/M(L)466/5(801) Diesel loco actual availability for August 2014. 01/09/2014
2014/M(L)/466/3(18) CMEs Conference-November,2014 01/09/2014
2014/M(L)/459/2 pt Fund required and status of sanctioned boards RSP items for 2014-15 pertaining to diesel locos. 01/09/2014
2014/Safety(DM)/7/1 Functioning of Vigilance Contoral Device (VCD) on Locomotives. 25/08/2014
2014/M(L)/459/2 Pt. Procurement of Wheel set with bull gear for 25 nos. HHP locos 27.08.2014
2013/M(L)/467/2. Punctuality performance of Diesel Loco. 25/08/2014
2013/M(L)/467/7(2) Punctuality loss of Mail/Express on diesel locos. 12.08.2014
2013/M(L)/466/6(7) Equipment Failures on Diesel locomotives 12.08.2014
2001/M(L)/466/75 Pt. Sale of overaged diesel locomotives 08/08/2014
2009/M(L)/466/5(801) Diesel Loco availability target for August, 2014. 05/08/2014
2007/Fuel/282/5pt Variation in Contingent (Incidental) Charges of HSD oil 04/08/2014
2009/Fuel/289/3 SFC on Indian Railways. 04/08/2014
2009/M(L)466/5(801) Diesel loco actual availability for  July 2014 01.08.2014
2014/M(L)/466/1(4) HHP Bulk Indent Meeting(BIM) at DLW/Varanasi. 22.07.2014
2010/Fuel/282/2/10 Issue of HSD oil for tower wagon. 18.07.2014
2014/M(L)/466/1(4) Diesel Loco(ALCO)- Bulk Indent Meeting at DMW/PTA. 15-07-2014
2009/M(L)/466/5(801) Revised Diesel loco availability targets for July,2014

15/07/2014

2014/M(L)466/3(18) CMEs Conference- 2014 14/07/2014
2009/M(L)466/5(801) Diesel loco Availability for June 2014 02/07/2014
2014/M(L)459/2pt. Position of RSB fitted on Locomotive. 04.07.2014
2011/M(L)/466/6(7) Equipment failure on diesel locomotive. 02-07-2014
2009/M(L)466/5(801) Diesel loco Availability for July 2014 02/07/2014
2009/M(L)466/5(801) Actual Availability of  diesel loco June 2014 01.07.2014
2014/M(L)459/2/pt. Position of items fitted on locomotives. 16.06.2014
2014/M(L)459/2/pt. Progress of Sanctioned Boards RSP items for 2013-14 pertaining to Diesel locos. 16.06.2014
2014/M(L)/466/3(18) Postponement of CMEs Conference-June, 2014 13.06.2014
2009/M(L)466/5(801) Punctuality loss of M/Exp on diesel loco May2014 10/06/2014
2014/M(L)/466/3(18) Final Agenda for CMEs Conference-2014 09/06/2014
2001/M(L)466/75  Deployment of Freight locos on Coaching Trains 05/06/2014
2003/466/68pt Pollution from Diesel Locomotives of Indian Railways-NGT Case. 05/06/2014
2013/M(L)/466/6(7) Equipment Failure on Dsl. Locomotive for April 2014 03.6.2014
2009/M(L)466/5(801) Diesel loco target June 2014 02/06/2014
2009/M(L)466/5(801 Diesel loco actual availability  for May2014 02/06/2014
2014/M(L)/466/3(18) CMEs Conference-2014 29.05.2014
2004/M(L)/466/3501 Diesel loco180 days  failure  23.05.2014
2009/M(L)466/5(801) Diesel Loco Punctuality April 2014 12.05.2014
2014 M(L)/466/3(18) Postponement of CMEs Conference May,2014 12.05.2014
2013/M(L)/466/6(7) Equipment Failure on diesel locomotive. 12.05.2014
2014/M(L)466/3(18) Supplementary Agenda for CMEs Conference ( Items suggested by CMEs). 09.05.2014
2009/M(L)/466/5(801) Diesel loco availability targets for May,2014 01.05.2014
2009/M(L)466/5(801) Diesel loco actual availability  for April 2014 02/05/2014
- Final Agenda for CME Conference 2014 -
2013/M(L)/101/2(BG) DEMU Co-ordination Meeting at ICF. 16.04.2014
Punctuality  Punctuality loss of Mail/Express on diesel locos. 09.04.2014
2014/M(L)/466/03(18)

CMEs Conference-May,2014.

Corrigendum for CME Conference

03.04.2014
2013/M(L)/466/06(07) Equipment failures on diesel locomotive. 03.04.2014
2002/Fuel/282/3 Rationalisation of fuelling pattern on Indian Railways 14.03.2014
2002/Fuel/282/3 Rationalisation of fuelling pattern on Indian Railways 01.04.2014
2009/M(L)466/5(801) Diesel loco actual availability for April 2013 to January 2014 01/04/2014
2009/M(L)/466/5(801) Diesel Loco Target for April 2014 01/04/2014
2010/M(L)/466/06(35) Diesel Maintenance Group Meeting for ALCO & HHP locos. 19.03.2014
2014M(L)/CEDO/SR/01 Runnin of BG 3 Coach High Speed Self Propelled Accident Relief Train (HS SPART) provided with Voith transmission [Transportation Code - SPRT (HS) 1], manufactured by ICF Chennai with maximum axle load of DPC 20.32t and that of TC 13.0t at a maximum speed of 75 kmph on entire section of S.E.C. Railway. 12.03.2014
2004M(L)/466/3501 Diesel loco actual availability for Oct.to Dec.2014. 25.02.2014
2013/M(L)467/2 Punctuality loss of Mail/Express on diesel locos. 11/03/2014
2013M(L)/466/(7) Equipment failures on diesel locomotive. 07.03.2014
2014/M(L)/466/01(2705) Rebuilding programme of diesel locos for the year 2014-15. 06.03.2014
2009/M(L)466/5(801) Diesel locos actual availability for April 2013 to March 2014. 03/03/2014
2009/M(L)466/5(801) Diesel locos actual availability for April 2013 to February 2014. 03/03/2014
2014/M(L)/466/1(2705) Rebuilding programme of diesel locos for the year 2014-15. 14/02/2014
2013/Fuel/289/3 Specific Fuel Consumption on Indian Railways 13.02.2014
2013/M(L)/466/06(7) Equipment failures on diesel locomotive. 11.02.2014
2013/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos 10.02.2014
20039/M(L)/466/05(801) Diesel loco availability targets for February, 2014. 03.02.2014
2009/M(L)466/5 (801) Diesel loco actual availability for April' 2013 to January'2014 03.02.2014
2013/M(L)/101/02 (BG) DEMU Co-ordination Meeting at ICF 29.01.2014
2014/M(L)/466/1(4) Bulk procurement of Ecotip Superstack and its repair kit. 23.01.2014
2011/M(L)/165/1pt.3 PNM-NFIR Meeting to be held on 30/01/2014 at Railway Board-Old item No. 38/2012- Hard working condition and excessive duty hours – Loco inspectors category-regarding. 21.01.2014
2013/M(L)/466/07(1203)GM locos Allotment of series for road numbering of WDG4 locos. 20.01.2014
2013/M(L)/466/6(7) Equipment failure on diesel locomotive. 20.01.2014
2010/M(L)/466/7(1203) Requirement of adequate funds in RE-13-14 and BFE-14-15 for PH-42. 15.01.2014
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways 13.01.2014
2009/M(L)466/5(801) Diesel locos punctuality loss for December 2013. 10.01.2014
2013/M(L)/459/2pt. Fund against sanctioned P.B. 2013-14. 07.01.2014
2009/M(L)/466/5(801) Diesel loco availability targets for January, 2014. 03.01.2014
2009/M(L)466/5(801) Diesel locos actual availability for April 2013 to December 2013. 01.01.2014

2013

2010/M(L)/466/7(1203) Requirement of adequate funds in RE-13-14 and BE-14-15 for PH-42. 26.12.2013
2001/M(L)467/2 Shield for best maintained running room. 10.12.2013
2013/M(L)/649/22 Inspection Notes of Shri Vivek Kumar, EDME/Tr./Rly. Board during his visit to Diesel Loco Shed Moula-Ali/South Central Railway on 06.12.2013 20.12.2013
2013/M(L)/459/2pt. Equipment failures on diesel locomotive. 19.12.2013
2013/M(L)/459/2Pt. Procurement of 100 nos Turbo Clutch Assembly for HHP locos. 16.12.2013
2013/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 10.12.2013
2009/M(L)/466/5 (801) Diesel loco availability targets for December,2013 -
2009/M(L)/466/5 (801) Diesel Loco Actual availability for April 2013 to November 2013. 02.12.2013
2001/M(L)/467/2. Shield for best maintained Running Room. 19.11.2013
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways 18.11.2013
2009/M(L)/466/1(4) Operation of repair and maintenance contracts with OEMs finalized by DLW & DMW.  14.11.2013
2013/M(L)/466/6(7) Equipment failure on diesel locomotive. 13.11.2013
2009/M(L)467/2 Punctuality Loss of Mail/Express on diesel loco for October 2013. 12.11.2013
2012/M(L)/459/2 Procurment of ALCO Engine blocks for supply to Zonal Railways against RSP 04.11.2013
2004/M(L)/466/3501 Failure of diesel locomotive with-in 180 days. 28.10.2013
2009/M(L)466/5(801) Diesel locos actual availability target for November 2013. 01/11/2013
2009/M(L)466/5(801) Diesel locos actual availability target for April 2013. 01/11/2013
2013/M(L)/459/2pt. Current status of bulk RSP Items. 28.10.2013
2010/M(L)/466/06(35) Diesel Maintenance Group Meeting for ALCO & HHP locos. 22.10.2013
2013/M(L)/467/2 Punctulity loss of Mail/Express on diesel locos. 10.10.2013
2001/M(L)/466/5 Modification to be implemented on ALCO locos during POH. 10.10.2013
2013/M(L)/459/2pt. Provision of 100 BG engine blocks. 09.10.2013
2013/M(L)/459/2pt. Progress of Sanctioned Boards RSP Items for 2013-14 pertaining to Diesel loco &DEMU: Requirement of funds at RE 2013-stage. 09.10.2013
2013/M(L)/466/(7) Equipment failures on diesel locomotive.  07.10.2013
2009/M(L)466/5(801) Diesel loco actual availability for April 2013 to September 2013. 04.10.2013
2009/M(L)/466/5(801) Diesel availability targets for October, 2013 01.10.2013
2013/M(L)/459/2pt. Provision of Loco Guard and ILI in dsl locos 26.09.2013
2013/M(L)/459/02 pt. Re-appropriation of fund for bulk RSP items 23.09.2013
2013/M(L)/459/02 pt. Fund against sanctioned P.B. 2013-14 19.09.2013
2013/M(L)/466/6(7) Equipment failures on diesel locomotive 18.09.2013
2013/M(L)/459/02 pt. Distribution of Crankshafts for HHP locos to zonal railways. 12.09.2013
98/M(L)/165/1 Pt.III. Provisional Para No1 of 2013 regarding Performance Audit report of Environment Management Indian Railway Workshops Sheds and Production Units. 11.09.2013
2011/M(L)/467/2 Punctuality loss of Mail/ Exp. On diesel locos. 11.09.2013
2013/M(L)/466/5(402). Approved source for child parts for assemblies. 04.09.2013
2009/M(L)/459/2 pt. Supply of Power Pack of WDG4 locos to Zonal Railways. 04.09.2013
2009/M(L)/466/5 (801) Diesel loco actual availability for April 2013 to August 2013 03.09.2013
2009/M(L)/466/5(801). Diesel loco availability targets for September,2013. 02.09.2013
2013/M(L)/459/2pt. Revision of estimates for RSP items. 02.09.2013
2004/M(L)/466/3501 Failure of Diesel Locomotive within 180 Days 22.08.2013
2013/M(L)/459/02pt. Allotment of Power Pack to Railways. 16.08.2013
2013/M(L)/459/02pt. Conversion of 1500 Oil type filter to paper type filter. 12.08.2013
2011/M(L)/467/2 Punctuality loss of Mail/ Exp. On diesel locos. 12.08.2013
2012/M(L)/469/02pt. Conversion of overaged WDM2 to WDS6R. 07.08.2013
2013/M(L)/459/1 Updating of locomotive in ICMS. 07.08.2013
2013/M(L)/466/6(7) Equipment failure on diesel locomotive. 02.08.2013
2009/M(L)/466/5 (801) Diesel loco actual availability for April 2013 to July 2013. 01.08.2013
2009/M(L)/466/5 (801) Diesel loco availability targets for August 2013. 01.08.2013
2013/M(L)/459/2pt. Procurement of 100 Turbo super charger/TSC. 31.07.2013
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 30.07.2013
2013/M(L)/466/1 (18) Minutes of CMEs' Conference held on 18th June' 2013. 15.07.2013
2013/M(L)/459/2Pt.A Replacement of Electro Mech Governor of 400 ALCO loco to Microprocessor based Governor. 11.07.2013
2013/M(L)/459/2Pt Fund requirement against Railway Board RSP allotment. 11.07.2013
2013/M(L)/459/2Pt.A VCD on 282 nos. locos 11.07.2013
2011/M(L)/467/2 Punctuality loss of Mail/ Exp. On diesel locos. 11.07.2013
2013/M(L)/459/2pt. Procurement of 500 motorised wheel set assembly. 04.07.2013
2013/M(L)/101/2BG. Details of DEMU. 03.07.2013
2013/M(L)/459/2pt. Procurement of 10 Turbo super charger for HHP locos. 03.07.2013
2013/M(L)/459/2pt. Procurement of 100 Turbo super charger/TSC. 03.07.2013
2013/M(L)/466/5(801) Diesel loco availability targets for July, 2013. 02.07.2013
2013/M(L)/466/5(801) Diesel loco  actual availability for April 2013 to June 2013. 02.07.2013
2013/M(L)/466/6(7) Equipment failures on diesel locomotive. 01.07.2013
2013/M(L)/466/3(33) Allotment of rehabilitated Engine blocks for the year 2012-2013. 13.06.2013
2013/M(L)/459/2 Pt. RSP items in Pink Book/White Book 2013-14. 25.06.2013
2013/M(L)/466/07(7) Monthly position of Equipment failure on Diesel Locomotives. 25.06.2013
2013/Fuel/289/3 Shedwise sfc figures of ALCO & HHP Locos. 24.06.2013
2010/M(L)/466/07 Requirement of HHP Locos for the year2013-14.14-15. 20.06.2013
2012/M(L)/466/4 Date for ALCO-BIM to be held at DMW/PTA. 14.06.2013
2012/M(L)/466/4 Date for HHP-BIM to be held at DLW. 14.06.2013
2013/M(L)/466/1(18) CME's Conference 12.06.2013
2011/M(L)/467/2 Punctuality loss of Mail/Express on Diesel locos for May 13. 11.06.2013
2013/M(L)/466/6(7) Equipment failures on Diesel locomotives 07.06.2013
2013/M(L)/466/1(18) CME's Conference June, 2013 06.06.2013
2009/M(L)/466/5 (801) Diesel loco availability targets for June'2013. 04.06.2013
2009/M(L)/466/5 (801) Diesel loco actual availability from April' 2013 to May 2013. 04.06.2013
2013/M(L)/466/1 (18) Minutes of CMEs' Conference held on 29th and 30th April, 2013. 03.06.2013
2013/M(L)/466/1(18) CME's Conference June,2013. 03.06.2013
2013/M(L)/459/2 Pt. Procurement of 100 Turbo super charger/TSC 28.05.2013
2013/M(L)/466/6(7) Equipment failures on Diesel locomotives 10.05.2013
2011/M(L)/467/2 Punctuality loss of Mail/Express on Diesel locos 10.05.2013
2013/M(L)/466/3 (33) Allotment of rehabilitated Engine blocks for the year 2013-14. 03.05.2013
2009/M(L)/466/5 (801) Diesel loco actual availability for April' 2013. 03.05.2013
2009/M(L)/466/5 (801) Diesel loco availability targets for May'2013. 30.04.2013
2004/M(L)/466/3501 FAILURE OF DIESEL LOCOMOTIVES WITHIN 180 DAYS. 30.04.2013
2010/Fuel/282/2/Pt.1 Procurement of Bi-Diesel 30.04.2013
2013/M(L)/466/3 (33) Supply of reclaimed Engine Block to Zonal Railways 18.04.2013
2013/M(L)/466/1(18) Supplementary Agenda for CMEs' Conference. 17.04.2013
- Agenda of CMEs Conference -
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 11.04.2013
2011/M(L)/466/6(7) Equipment failures on diesel locomotive 05.04.2013
2012/M(L)/466/1(18) CME Conference-April, 2013. 26-03-2013
2009/M(L)/466/5(801) Diesel locos actual availability for April 12 to March 13 03.04.2013
2009/M(L)/466/5(801) Diesel loco availability targets for April, 2013. 01.04.2013
2012/M(L)/466/3(18) CME Conference-April, 2013. 19.03.2013
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos for Feb 13. 11.03.2013
2011/M(L)/466/(7) Equipment failures on Diesel locomotive. 04.03.2013
2009/M(L)/466/5 (801) Diesel locos actual availability for April 2012 to February 2013. 01.03.2013
2009/M(L)/466/5 (801) Diesel loco availability targets for March, 2013. 28.02.2013
2001/M(L)/467/2 Shield for best maintained Running Room. 28.02.2013
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 25.02.2013
2010/M(L)/466/7 (1203) Deployment of HHP diesel locomotives for the year 2013-14 20.02.2013
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 11.02.2013
2003/M(L)/466/18 Requirement of NG Diesel locomotive by the end of 2017 05.02.2013
2009/M(L)/466/5(801) Diesel loco availability targets for February, 2013. 04.02.2013
2009/M(L)/466/5(801) Diesel loco actual availability for April 2012 to January 2013. 04.02.2013
2011/M(L)/466/6(7) Equipment Failure on Diesel Locomotives for April-December12. 01.02.2013
2011/M(L)/466/6(7) Equipment Failure on Diesel Locomotives for April-November12. 01.02.2013
2004/M(L)/466/3501 Revised position failure of Diesel Locomotive with in 180 Days/rebuilt/New Manufacture. 30.01.2013
2001/M(L)/467/2. Rationalization of supervision of Loco Running Staff. 28.01.2013
2004/M(L)/466/3501 Failure of Diesel Locomotives with in 180 days/rebuilt/new manufacture. 21.01.2013
2012/M(L)/466/1102 Rebuilding programme of diesel locos for the year 2013-14 21.01.2013
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 17.01.2013
2001/M(L)/466/75pt. Sale of Surplus Diesel locomotives. 14.01.2013
2001/M(L)/466/75pt. Sale of Surplus Diesel locomotives. 10.01.2013
2002/M(L)/466/1901 Disposal of Scrap during 2013-14. 10.01.2013
2011/M(L)/487/2 Punctuality loss of Mail/Express on diesel locos. 10.01.2013
2013/M(L)/466/7 Equipment failures on diesel locomotives. 08.01.2013
2009/M(L)/466/5(801) Diesel loco avability targets for January 2013. 02-01-2013
2009/M(L)/466/5(801) Diesel locos actual avability for April 2012 to December 2012  02-01-2013
2012/M(L)/466/901 Standardisation of Cab Layout. 02-01-2013
2000/M(L)/466/9Pt. Provision of cab heating arrangement. 02-01-2013
2004/M(L)/466/7101(SPAD) Incidents of Signal Passing at Danger(SPAD) 01-01-2013

2012

2007/M(L)/466/1(2705) Rebuilding programme of diesel locos at DMW/PTA during 2013-14. 17-12-2012
2012/M(L)/466/901 Standardisation of Cab Layout 14.12.2012
2004/M(L)/466/7101 Head on Collision between UP Goods Train No. MD/NY VPTG-W-1 and No. ME/NYG/NBOX-E of ECoR 24-05-2012
2007/M(L)/466/5(402) Use of rehabilitated components on new locomotives manufactured at  DMW/Patiala. 26.12.2012
2011/M(L)/466/3(33) Requirement of Engine Blocks during 2013-14 26.12.2012
2010/M(L)/466/07(1203)GM Requirement of HHP locos for the year 2013-14,14-15

18-12-2012

2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 10.12.2012
2011/M(L)/466/6(7) Equipment Failure on Diesel Locomotives for April-October12. 07.12.2012
2012/M(L)/165/1 Extra Expenditure on Retrofitment of Micro Processor based control system on Diesel Loco. 30.11.2012
2009/M(L)/466/7(814) Targets for lube oil filter plant(LOFP)/ Secunderbad 29.11.2012
2009/M(L)/466/5(801) Diesel locos actual availability for April 2012 to November 2012. 03.12.2012
2009/M(L)/466/5(801) Diesel loco availability targets for Dec.2012. 03.12.2012
2012/M(L)/459/2Pt. Upgraded Compressor (Oil free compressor) 50 nos. 14.11.2012
2010/M(L)/101(2) Resetting of Alarm Disc from ground level. 20.11.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 09.11.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotive. 05.11.2012
2009/M(L)/466/5(801) Diesel loco actual availability for April 2012 to Oct. 2012. 01.11.2012
2009/M(L)/466/5(801) Diesel loco availality targets for Nov.2012. 31.10.2012
2004/M(L)/466/3501 Failure of Diesel Locomotives with in 180 days/rebuilt/new Manufacture 31.10.2012
2009/M(L)/466/7(814) Revision of EAV. 19.10.2012
2009/M(L)/459/2 pt. Fund for Railway Board RSP items for the year 2012-12. Progress of Sanctioned Boards RSP items for 2012-13 01.10.2012
2010/M(L)/466/Misc. Winter preparedness drive. 16.10.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotive. 10.10.2012
2012/M(L)/466/Misc Minutes of Joint Meeting of Stores and Mechanical Department Officers held of 01.09.2012 at Northern Railway HQ (Baroda House) 10.10.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 09.10.2012
2009/M(L)/466/5(801) Diesel loco availality targets for Oct.2012. 01.10.2012
2009/M(L)/466/5(801) Diesel loco actual availability for April 2012 to Sept. 2012. 01.10.2012
2009/M(L)/466/5(801) Diesel loco availability targets for October, 2012 01.10.2012
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways 24.09.2012
2012/M(L)/466/1204 BG Diesel Satellite sheds/outpits. 20.09.2012
2009/M(L)/459/2 pt. Fuel level sensor for measuring fuel of 500 locos. 19.09.2012
2012/M(L)/459/2 Pt. Provision of 100 BG engine blocks. 18.09.2012
2004/M(L)/466/802/Pt. SPAD Cases of driver on Indian Railways. 14.09.2012
2004/M(L)/466/3501 Failure of Diesel Locomotives with in 180 days/rebuilt/new Manufacture 12.09.2012
2011/M(L)/467/2 Punctuality loss of Mail/ Express of diesel locos 10.09.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotive from Apr to July12 06.09.2012
2009/M(L)/466/5(801) Diesel loco availability targets for September, 2012 03.09.2012
2009/M(L)/466/5 (801) Diesel loco actual availability for April 2012 to August 2012. 03.09.2012
2012/M(L)/466/4 Postponement of HHP-BIM Meeting 2013-14. 28.08.2012
2011/M(L)/466/8/2302 Position regarding surplus plain suspension bearing loco wheel sets. 27.08.2012
2011/M(L)/487/2 Punctuality loss of Mail/Express on diesel locos. 08.08.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotive from Apr to June12 06.08.2012
2009/M(L)/466/5 (801) Diesel loco actual availability for April 2012 to July 2012. 01.08.2012
97/M(L)/466/1203 CRS clearance of operation of HHP Locomotives. 31.07.2012
2009/M(L)/466/5(801) Diesel loco availability targets for August, 2012 31.07.2012
2007/M(L)466/3 (1505) Vol.IV Repair and Overhaul of HHP Loco Traction Motors and Turbochargers. 21.07.2012
2007/M(L)466/3 (1505) Vol.IV Issue of materials for stabled HHP Locomotives in various Zonal Railways. 16.07.2012
2007/M(L)466/3 (1505) Vol.IV Material planning for HHP locomotives. 16.07.2012
2011/M(L)/467/2 Punctuality Loss cases on Diesel Miscellanious Account. 13.07.2012
2012/M(L)/466/4 Minutes of First Bulk Indent Meeting Held at DMW on 5th May'2012. 11.07.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos from April 12 to June12. 10.07.2012
2007/M(L)/466/19(84) Vol.II Allotment of radio frequencies for Distributed Power. 06.07.2012
2012/M(L)/466/3(18) Minutes of CMEs'Conference held on 21st and 22nd May 2012 at Northern Railway Hqs., New Delhi 09.07.2012
2010/M(L)/459/19(101) Revised Coaching Links, Power Plan and Divisional Wrking Time Table effective from 01.07.2012 03.07.2012
2010/M(L)/101/2(BG) Meeting on Fire cases in DHMU/DEMU coaches at Railway Board. 02.07.2012
2009/M(L)/466/5(801) Diesel loco actual availability for April 2012 to June 2012 02.07.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotive. 29.06.2012
2009/M(L)/466/5 (801) Diesel loco availability targets for July,2012. 29.06.2012
E(P&A)II-2005/RS-34 Revision in the rates of Kilometreage Allowance and Allowance in lieu of Kilometreage (ALK) with effect from 01.01.2011 28.06.2012
2012/M(L)/459/2 Pt. Capital spares for DEMUs- Board RSP 2012-13 22.06.2012
SD.EN-1.Misc Safety Checksheet for engaging over-aged WDM-2 locos for inferior services. 21.06.2012
2012/M(L)/459/2 Pt. Fund for Railway Board RSP items for the year 2012-13. 15.06.2012
2004/M(L)/466/7101 Minutes of the meeting regarding SPAD held on 12.06.2012 14.06.2012
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 11.06.2012
2012/M(L)/459/2 Pt. Fuel level Sensor for measuring fuel on 500 locos. 11.06.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 07.06.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos 07.06.2012
2012/M(L)/459/2 Pt. Traction Motors for AC dsl locomotives (60 nos.) 06.06.2012
2000/M(L)/466/75/ Pt. Sale of surplus diesel locomotives 05.06.2012
2012/M(L)/459/2 Pt. 60 Traction Motors AC-AC dsl locos 04.06.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotives 04.06.2012
2009/M(L)/466/5(801) Diesel loco actual availability for April 2012 to May 2012   01.06.2012
2007/M(L)/466/3 (1505) Vol.IV Stabled HHP locos. 31.05.2012
2009/M(L)/466/5(801) Diesel loco availability targets for June, 2012    31.05.2012
2010/M(L)/466/Misc. Meeting on SPAD    31.05.2012
2012/M(L)/459/2 Pt. Unit Cam shaft for 100 loco sets. 29.05.2012
2012/M(L)/459/2 Pt. Provision of comuter controlled brake system /electro pneumatic brake system on 30 locomotives.       29.05.2012
2002/M(L)/466/1505(P) Dual cab WDG4 locomotive. 28.05.2012
2010/M(L)/466/Misc. Meeting on SPAD. 28.05.2012
2010/M(L)/101/2(BG) DEMU Co-ordination Meeting at ICF. 28.05.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel Locos-Sample Position 25.05.2012
2001/M(L)/466/63/Vol.II Twin Pipe freight operations. 23.05.2012
2012/M(L)/466/3(18) CME Conference to be held  in New Delhi on 21st and 22nd May 2012. 17.05.2012
2012/M(L)/466/3(18) CME Conference May 2012. 10.05.2012
2009/M(L)/466/1(4) Postponement of CMPE/DSL's Conference. 10.05.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos for April 2012. 08.05.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotive from April 2011 to March 2012. 07.05.2012
2004/M(L)/466/3501 Details of Causewise failure analysis of WS & PU account (180 Days) 01.05.2012
2009/M(L)/466/5 (801) Diesel loco actual availability for April 2012 01.05.2012
2009/M(L)/466/5(801) Diesel loco availability targets for May,2012 30.04.2012
2010/M(L)/466/Misc. Incidents of Signal passing at danger. 25.04.2012
2004/M(L)/466/3501 Failure in 180 days of Diesel Loco Motive-reconstruction from Jan to March 2012 25.04.2012
2009/M(L)/466/1(4) Agenda items for discussions in CMPE/DSL's Conference 20.04.2012
2010/M(L)/466/3 (602) Improving reliability of HHP Locomotives. 17.04.2012
2009/M(L)/466/5(801) Revised Diesel loco availability targets for April,2012 11.04.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 09.04.2012
2009/M(L)/466/1(4) Bulk Indent Meeting 04.04.2012
2009/M(L)/466/5(801) Diesel loco actual availability for April,2011 - March 2012. 02.04.2012
2009/M(L)/466/5(801) Diesel loco availability targets for April,2012 02.04.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotive. 30.03.2012
2002/M(L)/466/1901 Disposal of Scrap during 2012-13 23.03.2012
2011/RS(B)/60/3 Budget Estimante - Demand No.16 Assests - Acquisition, Construction and Replacement for 2012-13 (Below 2.5 Crs.). 20.03.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos from Apr 2011 to Feb 2012. 09.03.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotive 07.03.2012
2004/M(L)/466/3501 Failure in 180 days of Diesel Loco Motive-reconstruction 05.03.2012
2009/M(L)/466/5 (801) Diesel loco actual availability for April'2011- February 2012 05.03.2012
2010/Fuel/282/27 Quantum of Entry Tax on HSD 02.03.2012
2009/M(L)/466/5 (801) Diesel loco availability targets for March  2012 29.02.2012
2012/M(L)/466/3(18) Presentation during CMEs Conference at DLW. 16.02.2012
2012/M(L)/466/3(18) Agenda Item for CMEs Conference. 16.02.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 08.02.2012
2009/M(L)/466/1(4) Shortage and quality issues of safety equipment/material 07.02.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotive 03.02.2012
2009/M(L)/466/5(801) Diesel loco actual availability for April 2011-January 2012 01.02.2012
2009/M(L)/466/5 (801) Diesel loco availability targets for February, 2012 31.01.2012
2006/M(L)/467/2 Provision of subsidized meal/food to the running staff in the Running Room 27.01.2012
2012/M(L)/466/3/(18) CME's Conference to be held on 24th & 25th February, 2012 at DLW/Varanasi 27.01.2012
2012/M(L)/466/3(18) CMEs Conference to be held on 17th and 18th February, 2012 at Goa, South Western Railway. 13.01.2012
2009/M(L)/466/5 (801) Revised Diesel loco availability targets for January, 2012 10.01.2012
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos.   09.01.2012
2007/M(L)/467/2 Detention to Foreign Railway Locos in sheds. 09.01.2012
2011/M(L)/466/6(7) Equipment failures on diesel locomotive for Apr 2011 to Nov 2011. 03.01.2012
2008/ML)/466/2 (801) Diesel loco actual availability for April 2011-December 2011 02.01.2012
2011
2009/M(L)/466/5(801) Diesel loco availability targets for January,2012. 30.12.2011
2009/M(L)/466/5(801) Diesel Loco availability targets for January, 2012 30.12.2011
2010/M(L)/101/2(BG) Maintenance of DEMUs on IR. 29.12.2011
2007/M(L)/466/1 (2705) Rebuilding programme of Diesel Locos for the year 2012-13. 28.12.2011
2004/M(L)/466/3501 Failure in 180 days of Diesel Loco Motive-reconstruction  22.12.2011
2004/M(L)/466/7101 Action plan to reduce SPAD cases. 23.12.2011
2008/M(L)/467/1 Progress of implementation of Crew Management System (CMS). 20.12.2011
2003/M(L)/466/1204 Homing of Diesel Locomotives on IR. 20.12.2011
2003/M(L)/466/1204 Progress of works of diesel and DEMU sheds. 19.12.2011
2009/Fuel/282/19 Explosives clearance for RCDs 19.12.2011
2001/M(L)/467/2 Shield for best maintained running room 12.12.2011
2011/M(L)/165/1 Improvement in the condition of Running Rooms 12.12.2011
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos Apr. to Nov. 2011. 09.12.2011
2011/M(L)/466/6(7) Equipment failures on diesel locomotives for Oct 2011. 07.12.2011
2011/M(L)/459/2 Pt. Motorized Truck Assembly for (WDG3A) diesel locomotives 02.12.2011
2009/M(L)/466/5 (801) Diesel loco availability targets for December 2011 01.12.2011
2008/M(L)/466/2(801) Diesel loco actual availability for April 2011-November 2011 01.12.2011
2011/M(L)/467/2 Punctuality Performance of Diesel Sheds. 25.11.2011
2001/M(L)/467/2(Shield) Shield for best maintained running room for 2011-12. 25.11.2011
2011/Elect(TRS)/480/1 Pt.IV Augmentation of capacity of Electric/Diesel Loco Sheds. 21.11.2011
2011/M(L)/466/3(33) Supply of ALCO Engine Block to Zonal Railways 17.11.2011
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos. 09.11.2011
2011/M(L)/466/6(7) Equipment failures on diesel locomotives. 09.11.2011
2011/M(L)/466/15(18) Minutes of CME's Conference to be held on 1st and 2nd August 2011 at Railway Board, New Delhi. 08.11.2011
2010/M(L)/466/Misc Incidences of Signal passing at danger & winter/fog preparedness drive 04.11.11
2009/M(L)/466/5 (801) Diesel loco availability targets for April11 to October 2011 01.11.2011
2009/M(L)/466/5 (801) Diesel loco availability targets for November 2011 31.10.2011
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos 10.10.2011
2004/M(L)/466/Misc Installation of Fogsafe/Fogpass 10.10.2011
2004/M(L)/466/802 Pt. Facilities for achieving 90 days trip schedules on HHP (EMD) locomotives 04.10.2011
2009/M(L)/466/5 (801) Diesel loco availability targets for October 2011 03.10.2011
2009/M(L)/466/5 (801) Diesel loco availability targets for April11 to September 2011 03.10.2011
2011/M(L)/466/(6)7 Equipment failure on diesel locomotive for August 2011 27.09.2011
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways 23.09.2011
2003/M(L)466/1204 Working of spectrograph in diesel shed. 14.09.2011
2011/M(L)/467/2 Reporting of Diesel Punctuality loss in ICMS/PAM. 13.09.2011
2011/M(L)/467/2 Punctuality loss of Mail/Express on diesel locos 09.09.2011
2010/Fuel/282/10 Issue for HSD for non-traction purposes. 07.09.2011
2009/M(L)/466/5 (801) Diesel loco availability targets for April11 to August 2011 02.09.2011
2009/M(L)/466/5 (801) Diesel loco availability targets for September 2011 30.08.2011
2010/M(L)/101/2(BG) Position relating to DEMU Ineffective 25.08.2011
2010/M(L)/101/4 (BG) Policy Write Back Adjustment of Original cost of Rolling Stock.(Revised) 11.08.2011
2010/M(L)/101/4(BG) Policy Write back adjustment of original cost of rolling stock. 11.08.2011
2007/M(L)/466/3 (1505) Vol.IV Minutes of the meeting regarding supply of EMD spares by DLW held in Railway Board on 20.06.2011 18.08.2011
2011/M(L)/466/(6)7 Equipment failure on Material account 05.08.2011
2004/M(L)/466/3501 Diesel Loco Failure within 180 Days April 11 to June 11 04.08.2011
2004/M(L)/466/3501 Diesel Loco Failure within 180 Days Jan 11 to March 11 01.08.2011
2011/M(L)459/2 Pt Fund against sanctioned P.B.2011-12. 22.07.2011
2011/M(L)/467/2 Punctuality performance of Zonal Railways. 21.07.2011
2000/M(L)/466/803/Pt. Vol. Running of dead diesel locomotives 13.07.2011
98/M(L)/466/29 Function of VCD on DSL Locos. 13.06.2011
2009/Fuel/289/3 Speciffic Fuel Consumption on Indian Railways.

13.06.2010 & 
10.06.2011

2011/M(L)/467/2 Punctuality Loss of Mail/Express on diesel locos. 07.06.2011
92/M(L)466/6001 Disposal of MG diesel locomotives 31.05.2011
2011/M(L)/466/(6)7 Equipment failure on diesel locomotive 26.05.2011
2011/M(L)/466/(6)7 Poor performance of diesel locomotives 23.05.2011
2011/M(L)/467/1 Information regarding Crew and Diesel Loco. 12.05.2011
2009/M(L)/466/5 (801) Diesel loco actual availability for April’2011 02.05.2011
No.2010-B-209 Distribution of finance component of Lease Charges payable to Indian Railways Finance Corporation - Minor Head - 700. 19.04.2011
2002/M(L)/466/1901 Disposal of Scrap during 2011-12 11.04.2011
97/M(L)/466/1203/Vol.1 CRS Sanction for WDP4D Locos. 04.04.2011
2008/Fuel/289/3 Trend of Line Haul Cost (LHC) 07.04.2011
2007/M(L)/467/2 Punctuality Loss of Mail/Express on Diesel Locos (Shed Wise) 07.04.2011
2007/M(L)/467/2 Punctuality Loss of Mail/Express on Diesel Locos 07.04.2011
2011/M(L)/459/2 Pt, Railway Wise requirement of RSP itms 2011-12 01.04.2011
2009/M(L)/466/5 (801) Diesel loco actual availability for April’2010-March’2011 01.04.2011
2009/M(L)/466/5 (801) Diesel loco availability targets for April’2011 31.03.2011
2008/M(L)/466/2(801)/FOIS Reporting of Loco Shed Outage-Modification in FOIS/COIS 29.03.2011
2001/M(L)/467/2 Loco Pilots found during pre-booking breathalyzer test 18.03.2011
2010/M(L)/467/3 Enlargement of CUG Scheme to operational and maintenance staff of divisions 18.03.2011
2009/Fuel/289/3 Line Haul cost of Diesel Locomotives 16.03.2011
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 16.03.2011
2004/M(L)/466/3501 Diesel locomotive failure within 180 days- Rebuilt/newly built 10.03.2011
2001/M(L)/467/2 Training of Loco Inspectors 23.02.2011
2000/M(L)/466/9 Provision of seat for Inspecting official in loco cab 23.02.2011
2010/M(L)/466/801 Outage reporting through ICMS/FOIS 22.02.2011
2009/Fuel/289/3 Specific Fuel Consumption on Indian Railways. 21.01.2011
2001/M(L)/467/2 Shield for best maintained running room. 11.01.2011
2002/M(L)/466/2704 Co-ordination issues with BHEL/Bhopal. 04.01.2011

2010

2007/M(L)/466/1(2705) Rebuilding programme of diesel locos for the year 2011-12 28.12.2010

2010-M (D)/814/2

Age statement of Diesel locos as on 30.11.2010 - BG

14.12.2010

2009/Fuel/289/3

Deterioration in SFC figures for passenger services.

14.12.2010

2004/M(L)/466/7101

Drive to curb accident on crew account.

14.12.2010

2010/M(L)/466/801

Punctuality reporting through ICMS

13.12.2010

2009/M(L)/466/1(4)

Compliance of Bulk Indent on Zonal Railways.

10.12.2010

2001/M(L)/467/2(Shield)

Shield for best maintained running room.

06.12.2010

2009/M(L)/466/3(18)Pt.

Minutes of CMEs Conference held on 24th and 25th October, 2010 at IRIMEE, Jamalpur.

02.12.2010

2008/M(L)/467/1

New CMS application released by CRIS

01.12.2010

2008/Fuel/289/3

Trend of line haul cost.

30.11.2010

2001/M(L)/466/75

Utilization of inferior service locos

30.11.2010

2001/M(L)/467/2

Re-engagement of retired staff on daily remuneration basis for the post of loco-pilots (both diesel and electrical drivers) and guards.

29.11.2010

2004/M(L)/466/7101

SPAD cases on diesel crew account

09.11.2010

2003/M(L)/466/803

Filters for EMD locomotives

04.11.2010

2004/M(L)/466/7101

Over 10 hr. duty and mileage earning of running staff.

02.11.2010

2001/M(L)/467/2

Use of mobile phones by LPs during train Operation.

02.11.2010

2010/M(L)/466/Misc

Winter preparedness drive.

02.11.2010

2009/M(L)/466/1/(4)

Minutes of CMPE/Dsl’s Conference held at Railway Board on 15.09.2010

29.10.2010

2004/M(L)/466/7101

Road learning of Loco Pilots.

28.10.2010

2001/M(L)/467/2

Shield for best maintained running room for 2010-11.

27.10.2010

2007/M(L)/467/2

Punctuality loss of Mail/Express on diesel locos

11.10.2010

2009/M(L)/466/3(18)

 CMEs’ Conference to be held on 24th and 25th October 2010 at IRIMEE, Jamalpur, East Central Railway (Revised) 

Annexures                                    PU Items

11.10.2010

2009/M(L)/466/5(801)

Diesel Loco availability targets for October 2010.

30.09.2010

2004/M(L)/466/7101

Analysis of SPAD cases

21.09.2010

99/M(L)/466/29

Working of VCD on Locomotives

21.09.2010

2010/M(L)/101/4 (BG) Policy

Premature condemnation of DMU motor and trailer coaches

10.09.2010

-

Minutes of the meeting regarding procurement policy for EMD spares held in Railway Board on 19.07.2010 and 24.07.2010

-

2010/M(L)/466/Safety(Fog Safe)

Provision of GPS based Fog Safe Devices on Diesel Locos/DEMUs

08.09.2010

2007/M(L)/466/7

Analysis of asset failure.

03.09.2010

2009/M(L)/466/1(4)

Agenda items for discussions in CMPE/Dsl’s Conference.

01.09.2010

2000/M(L)/466/9

Provision for seat for Inspecting official in loco cab.

01.09.2010

2010/M(L)/466/Misc

Train Operation during FOG - Precautions.

30.08.2010

2007/M(L)/466/3(1505)(yardstick)

Manpower Planning norms for EMD locos.

30.08.2010

2007/M(L)/467/2

Minutes of CME’s Conference held at Goa in March 10

18.08.2010

94/M(L)/466/32

Automatic" Switching-On" of Flasher Lights on Locomotives

23.02.2001

2007/M(L)/467/12

Punctuality Loss Cases on Diesel Loco Account (BG)

16.07.2010

2004/M(L)/466/710

Implementation of ’Golden Hour’ concept and role of Diesel Locomotive

30.06.2010

2009/M(L)/467/1

Replacements of Drivers and Guards Boxes
        RDSO Report      Reference Letters   

18.06.2010

2003/M(L)/466/20

Extending trip schedule periodicity of ALCO locomotives to 40 days

13.05.2010

2010/M(L)/466/5

Provision of Data extraction equipment in the division with the Mech. Power Controllers.

07.05.2010

2009/Safety(A&R)/19/29

Use of Wakie-Talkie Sets

10.03.2010

No.97/M(L)/466/1203 WDG4/WDP4

Allotment of Series for road numbering of WDP4 locos

07.04.2010

No. 2006/M(L)/467/2

Provision of subsidized meal/food to the running staff in the Running Room

31.03.2010

No. 2004/M(L)/466/802

Trip Schedules for diesel locomotives

11.03.2010

No.2006/Fuel/282/5/Pt

Revised JPO for checking of HSD Oil at RCDs and RDIs.

09.03.2010

No.2009/M(L)/467/2

Provision of subsidized meals to Running Staff.

24.02.2010

No.2008/RS(G)/779/10

Nomination of DLW to arrange items for GM locos.

17.02.2010

No. 98/M(L)/466/35

Manpower Planning norms for DMUs.

17.02.2010

2010/M(L)/466/4

Effect of CC+8+2T

01.02.2010

2009

No.2009/M(L)/466/2 (19) Policy

Policy in regard to premature condemnation of locomotives damaged in accidents.

23.12.2009

No.98/Safety(A&R)/19/16

Precautions for Train operation during Fog

07.12.2009

2009/Fuel/282/7

Fuelling of diesel locomotives

07.12.2009

--

Complete List of Pending

--

2009/M(C)/60/12

Itemised Rolling Stock Programme of the Railways for 2009-10 Budget estimates for.

04.11.2009

2001/M(L)/467/2

Shield for best Maintained Running Room

27.10.2009

E(MPP)2009/3/36

Revised Training Module for Loco Pilots (Goods)

26.10.2009

E(W)2009/WE/5/8

Nominated Senior Welfare Inspector(SWI) exclusively for Loco Pilots(LPs) and Assistant Loco Pilots(ALPs).

23.10.2009

2004/M(L)/466/802

Rationalization of operation of Diesel Locos

19.10.2009

2004/M(L)/466/7101

Practical Loco Handling training before promotion of LP(Goods)

31.08.2009

2004/M(L)/466/7101

Prevention of accidents on crew account

20.08.2009

2009/M(L)/459/2/RSP/2009-10

Rolling Stock Programme (locomotives) for 2009-10

03.08.2009

2004/M(L)/466/7101

Monitoring of breach of rest and 10 hours duty rules.

14.07.2009

E(MPP)/2009/3/26

Introduction of Training Modules for training of Loco Inspectors (Diesel and Electric)

13.07.2009

E(MPP)/2009/3/14

Revised Training Program for Assistant Loco Pilots.

05.06.2009

2004/M(L)/466/802

Running of monthly overdue diesel locomotives

10.02.2009

2008

2003/M(L)/466/20

Movement of overdue and dead diesel locomotives

04.01.2008

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 14-09-2018  

 Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.