General Rules Review Committee
( Railway Board )
Disclaimer
Proposed GR Revised on 24.04.2008
I
PRELIMINARY (Proposed Draft Rules partly framed)
X
CONTROL & WORKING OF STATIONS (Proposed Draft Rules framed)
II
RULES APPLYING TO RAILWAY SERVANTS GENERALLY (Proposed Draft Rules framed)
XI
WORKING OF TRAINS GENERALLY (Proposed Draft Rules framed)
III
SIGNALS (Proposed Draft Rules framed)
XII
AUDIO VISUAL AIDS (Proposed Draft Rules framed)
IV
STATIONS AND THEIR EQUIPMENT OF SIGNALS (Proposed Draft Rules framed)
XIII
FAILURES, UNUSUAL OCCURRENCES & ACCIDENTS (Proposed Draft Rules framed)
V
SYSTEM OF WORKING (Proposed Draft Rules framed)
XIV
PERMANENT WAY & WORKS (Proposed Draft Rules framed)
VI
ABSOLUTE BLOCK SYSTEM (Proposed Draft Rules framed)
XV
LEVEL CROSSING (Proposed Draft Rules framed)
VII
AUTOMATIC BLOCK SYSTEM (Proposed Draft Rules framed)
XVI
WORKING OF TRAINS IN ELECTRIFIED SECTIONS (Proposed Draft Rules framed)
VIII
ONE TRAIN ONLY SYSTEM (Proposed Draft Rules framed)
XVII
MISCELLANEOUS (Proposed Draft Rules framed)
IX
TRAIN FOLLOWING SYSTEM (Proposed Draft Rules framed)
APPENDIX (Under Preparation)
* * *
:: Site Developed by : Railway Board Computer Center :: Contact Us :: :: Disclaimer ::