FREIGHT RATE CIRCULARS - 2008

 

You must have the latest version of Acrobat Reader to read the files in PDF format
What's RC-56 || Corrigendum-4 of RC-28 ||

 

Gazette Notification No.1133 dated 08.08.2008

Rate Ins. No.

Letter No. 

Subject

Issued Date Ref.
RC-56 TCR/1394/2008/11 Charging for privately owned BCBFG wagons.

13.10.2008

 

 
RC-55 No.TCR/1147/2008/2 Transportation of Relief Material (Speed Boats/Boats) from flood affected Bihar State: free of charge. 08.10.2008  
RC-54

Corrigendum dated10.10.2008

TCR/1015/2008/1. Adjustments in classification of commodity. 06.10.2008  
RC-53 TCR/1618/2007/10

Freight concession for Iron- Ore traffic (Class 200X) from SW Railway  to Panambur.

03.10.2008  
RC-52

TCR/1147/2008/3.

Transportation of Relief Material/Fodder to notified flood  affected districts of Assam State: free of charge.    

25 .09 .2008

 

 
RC-51

TCR/1147/2008/4.

Transportation of Relief Material to notified flood  affected districts of Orissa State: free of charge.     

25 .09 .2008

 

 
RC-50 TC-I/2002/109/5/pt.

Acceptance of weightometer/Belt Weigher at par with  weighbridges for weighment of loose consignment.

25.09.2008  
RC-49 2007/TC-I/302/1

Operation of container trains by Private Container Operator (PCO) in Railway owned terminals

23.09.2008  
RC-48

TCR/1078/2008/11.

 

Dynamic Pricing Policy – Levy of Busy Season Charge. 23.09.2008  
Amendment-3
 dated 19.09.2008
No.TCR/1394/2004/2 Permitting running of freight trains on CC+6 routes Universalisation 19.09.2008 RC-76
of 2007
RC-47 No.TCR/1644/2008/3 Rebate in freight for traffic transported in privately owned wagons. 08.09.2008  
RC-46 No.TCR/1644/2008/3 Rebate in freight for Ammonia (Anhydrous Liquefied Gas) and
Phosphoric Acid transported in privately owned tank wagons.
08.09.2008  
RC-45 TCR/1618/2007/10

Freight concession for Iron- Ore traffic from SW Railway to  VKT.

28.08. 2008  
RC-44 TCR/1618/2007/10 Freight concession for Iron- Ore traffic. 28.08. 2008

 

 
RC-43

Addendum
dated 23.09.2008

Corrigendum
dated 29.08.2008

TCR/1147/2008/2

 

Transportation of Relief Material/Fodder to notified flood affected districts of Bihar State: free of charge.

28.08. 2008

 

 
RC-42 TCR/1394/83/6 Pt.

Tare weighment of empty wagons supplied to steel plants.

13.08.2008

 
RC-41 TCR/1618/2006/18  

Freight Concession on Bamboo traffic originating from NF Railway.

13.08.2008  
RC-40 No.TCR/1078/90/1 Exemption from levy of dump charges on traffic booked under special arrangements moving via break of gauge points. 11.08.2008  
RC-39 No.TC-1/2004/104/1-pt. Guidelines for Electronic Payment System 04.08.2008  
RC-38 No.TCR/1015/2008/2 Rates for Automobile Traffic carried on NMG and BCACM
wagons.
01.08.2008  
RC-37

Corrigendum

No. TCR/1015/2008/3 Adjustments in classification of commodities- Inclusion of commodities" Bentonite Sulpher Pastilles (Straight Sulpher Fertilizer)' and' Water Soluble Fertilizer'. 25.07.2008  
RC-36

Corrigendum

TCR/1618/2008/7        Freight concession for Iron- Ore traffic. 11. 07.2008  
RC-35 TCR/1078/2008/6

Policy Guidelines- Special Freight Incentive Scheme for Iron Ore

11. 07.2008

RC-34

No.TCR/1099/2005/2

 

Withdrawal of inflation in distance between Dharmavaram(DMM)-
Bangalore(SBC) section on South Western Railway.
09.07.2008  
RC-33 No.TCR/1099/2008/3 Withdrawal of inflation in distance between Khandwa-Hingoli
section on South Central Railway.
07.07.2008  
RC-32 TCR/1078/2008/11.

Dynamic Pricing Policy – Levy of Special Supplementary Charge.

02 .07.2008

 

 
RC-31 TCR/1394/2003/11

Permissible Carrying Capacity of BOXNHSM1 wagons

02 .07.2008  
RC-30 TCR/1078/2007/3 Classification of Iron Ore

01.07.2008

 
RC-29 No.TCR/1078/2008/11 Dynamic Pricing Policy – Levy of Special Supplementary Charge. 25.06.2008  
RC-28

Corrigendum-4

Corrigendum-III

Corrigendum-II

Corrigendum-I

TCR/1394/2004/2

Running of freight trains on CC+8 routes.

18.06.2008

13.10.2008

 
RC-27

TCR/1618/2007/9

 15 % (Fifteen percent) concession in freight rates for Timber Waste.

 17.06.2008  
RC-26

TCR/1055/95/1

Revision of Haulage Charges payable to Port Trusts.

09.6.2008

 
RC-25 TCR/1078/2008/15 Policy Guidelines- Freight Incentive Schemes and Transportation Products 

13.06.2008

 
Addendum-12 No.TCR/1394/2004/2 Running of freight trains on CC+8 routes. 27.05.2008 RC-69
of 2007
Addendum-11 No.TCR/1394/2004/2 Running of freight trains on CC+8 routes. 26.05.2008 RC-69
of 2007
Corrigendum-15 No.TCR/1078/2007/1 Standard rake size of covered wagons for grant of trainload rate. 21.05.2008 RC-25 of 2007
RC-24 TCR/1078/2007/3.

Adjustment in the classification of Iron Ore for Export and Dynamic Pricing Policy -  Congestion charge

12.05.2008

 
RC-23 No.TCR/1078/2008/1 Operation of Merry-Go-Round (MGR) System by Railways. 09.05.2008  
Corrigendum-14 No.TCR/1078/2007/1 Standard rake size of covered wagons for grant of trainload rate. 01.05.2008 RC-25 of 2007
RC-22 No.TCR/2205/96/1. Hire Charges for Test Wagon. 02.05.2008  
RC-21 No.TCR/ 1644/90/1 Vol I Rebate in freight rates for movement of bulk
cement.
29.04.2008  
Corrigendum to addendum-9 No.TCR/1394/2004/2 Running of freight trains on CC+8 routes. 29.04.2008 RC-69
of 2007
RC-20 No.TCR/1015/2008/1. Adjustments in classification of commodity. 29.04.2008  
RC-19 No. TCR/1644/2006/1 Rebate in freight Rates on Caustic Soda Lye traffic transported in the privately owned BTCS wagons 29.04.2008  
RC-18 No.TC-I/2002/214/5 All India Engine Hour Cost(AIEHC) for recovery of siding/ shunting
charges
25.04.2008  
RC-17 No.TC-I/2005/201/2 Pt.D Free time for unloading of hopper wagons in case of seven old steel plants 16.04.2008  
Addendum-10 No.TCR/1394/2004/2 Running of freight trains on CC+8 routes. 08.04.2008 RC-69
of 2007
RC-16 No.TCR/1099/92/2 Withdrawal of inflation in distance on Parli Vaijnath-Parbhani,
Parbhani-Purna, Purna-Nanded and Nanded-Mudkhed sections.
31.03.2008  
RC-15 TCR/1078/2007/3.

Dynamic Pricing Policy – Congestion Charge.

31.03.2008 RC-13
of 2008
RC-14 TCR/1015/2008/1.

Adjustments in classification of commodity.

31.03.2008  
RC-13 TCR/1078/2007/3

Dynamic Pricing Policy –  Congestion  Charge.

31.03.2008 RC-106
of 2007

Corrigendum-13

  Freight Incentive Schemes and Transportation Products: Policy guidelines. 31.03.2008 RC-25
of 2007
RC-12 TCR/1078/2008/11. Dynamic Pricing Policy – Levy of Busy Season Surcharge.

28.03.2008

 

RC-89
of 2007
RC-11 No.TCR/2201/2006/1 Haulage Charges of Brake Van utilized by Container Train Operators 25.03.2008  
RC-10

Corrigendum-1
dated 26.03.2008

No.2007/TC-I/302/1 Operation of container trains by Private Container Operator(PCO) in
Railway owned terminals
25.03.2008  
RC-9

TCR/1078/2008/8

Adjustments in Freight Rates effective from April 1, 2008 – Railway Budget 2008-09.

20.03.2008

 
RC-8 TCR/1078/2007/8

Policy Guidelines - Freight Incentive Schemes for Traditional Empty Flow Directions.

17.03.2008

 
RC-7

TCR/2211/2001/21

Freight concession for North Eastern States. 13.03.2008  
RC-6

TCR/1078/2008/8   

Adjustments in Freight Rates effective from April 1, 2008 – Railway Budget 2008-09

05. 03.2008

 
 

GAZETTE NOTIFICATION regarding Notified Stations

13.02.2008  
RC-5 No.TCR/1394/2007/2 Running of freight trains in 25 tonne axle load route. 07.02.2008  
RC-4

TCR/1147/2007/2

Transportation of blankets  to notified flood affected Balasore district of Orissa State: free of charge.

31.01 .2008

 
RC-3  TC-I/2004/201/9 Pt.B

Rules for waiver of demurrage/wharfage charge

24.01.2008  
RC-2

TCR/1644/90/1 Vol I

Rebate in freight rates for movement of bulk cement.

 24.01.2008 RC-78
2007
RC-1

 TCR/1015/2008/1.

Adjustments in classification of commodities.

02.01.2008