|
Rates Circular No.
37/2005
GOVERNMENT OF INDIA (BHARAT SARKAR)
MINISTRY OF RAILWAYS (RAIL MANTRALAYA)
(RAILWAY BOARD)
| No. 99/TC-I/101/2 |
New Delhi,
dated 22-6-2005 |
The General Manager(Comml.)
The General Manager(Optg.)
All Indian Railways.
Sub: Revision of Wagon Registration Fee-Payment of Lump sum deposit.
Please connect para 2.0 of Board’s letter of even number dated
22.3.2005 (Rates Circular No.13 of 2005) wherein it was advised that
Public Sector Undertakings/Corporations and the private sidings having
regular transactions with a Railway may be permitted, at the discretion of
the Railway, to pay a lump sum deposit in lieu of payment of registration
fee each time an indent is made for wagon supply. The lump sum deposit
payable should be fixed equivalent to 3(three) days’ average level of
loading based on the peak month’s figures during the previous 12 months,
for each individual case. The maximum number of indents pending at any
given time for that siding/customer should also be limited to the number
of rakes equivalent to 3(three) days loading for which the lump sum
deposit has been deposited by the customer.
In partial modification of the above instructions in Rates Circular No.13
of 2005, Board has now decided that Public Sector
Undertakings/corporations shall be allowed to place indents more than the
aforementioned limit by enhancing the lump sum registration fee
proportionately.
The instruction will come into force with
immediate effect.
This issues in consultation with the
Finance and Traffic Transportation Directorates in the Ministry of
Railways. Receipt of this letter may
please be acknowledged.
N. K.Parsuramka)
Jt. Director, Traffic Comml. (Rates)
Railway
Board
|