|
Rates Circular No.
13 /2005
GOVERNMENT OF INDIA/BHARAT SARKAR
MINISTRY OF RAILWAYS/RAIL MANTRALAYA
(RAILWAY BOARD)
| No. 99/TC-I/101/2 |
New Delhi, dated -3-2005 |
The General
Manager(Comml.)
The General Manager(Optg.)
All Indian Railways.
Sub: Revision of
Wagon Registration Fee-Payment of Lump sum deposit.
Please
connect para ‘4’ of Board’s letter of even number dated 31.1.2005 (Rates
Circular No.6 of 2005) wherein it was advised that Rule No. 201(20) of
Goods Tariff No. 41 Part 1(Volume 1) dealing with lump sum deposit, in
lieu of wagon registration fee may be deleted. Also connect Board’s
message of even number dated 24.2.05 wherein it was advised to defer the
application of Rates Circular No.6 of 2005 for traffic in steel and coal.
2.0 In partial
modification of Rate Circular No.6 of 2005 and in supersession of Board’s
message referred to in above para, Board has now decided that Public
Sector Undertakings/Corporations and the private sidings having regular
transactions with a Railway may be permitted, at the discretion of the
Railway, to pay a lump sum deposit in lieu of payment of registration fee
each time an indent is made for wagon supply. It has been decided that
the lump sum deposit payable should be fixed equivalent to 3(three) days’
average level of loading based on the peak month’s figures during the
previous 12 months, for each individual case. The maximum number of
indents pending at any given time for that siding/customer should also be
limited to the number of rakes equivalent to 3(three) days loading for
which the lump sum deposit has been deposited by the customer.
3.0 The rules
regarding forfeiture of Wagon Registration Fee will be applicable in the
instant case. However, the amount to be forfeited will not be entire lump
sum deposit but specific amount pertaining to individual rake which will
only attract forfeiture. In such cases, the customer will have to recoup
the amount forfeited so that lump sum amount is maintained at the
stipulated level.
4.0 The
instruction will come into force with immediate effect.
5.0 This issues
in consultation with the Finance and Traffic Transportation Directorates
in the Ministry of Railways.
Receipt of
this letter may please be acknowledged.
N. K.Parsuramka
Jt.
Director, Traffic Comml. (Rates)
Railway Board |